Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
8 Oct 2026, 2:00 pmClosed
EE
EE
1. Ward-86 ke antargat Bhawan Sankhya 117/Pi/754 Shri Anup Kumar Pandey ke ghar se Bhawan Sankhya 117/Pi-1/304 Shri Manish Dixit ke ghar tak 300 MM vyaas ki 80 meter nai sewer line daalne ka karya.
2026_DOLBU_1192111_1
JalKal / 2657 / EE Zone 6
Open Tender
Miscellaneous Works
Percentage
JALKAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
FC
₹42,000
8 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of C.C. Road With Supply of lab,T&P etc all comp. (As Per UPJN SOR) | 95.36 | Sqm | 404.6 | ₹38,582.66 |
| 2 | Excavation of Foundation in Ordinary soil including Supply of lab, T&P etc all comp. (As Per UPJN SOR 2023-24 Item Code-3001) | 131.04 | Cum | 291.89 | ₹38,249.27 |
| 3 | Concrete work With Brick Blast, L.Sand & Cement in foundation in Prop. of 10:5:1 including Supply Lab,Mat,T&P etc all Comp. | 6.34 | Cum | 4,747.35 | ₹30,098.2 |
| 4 | Making Necessary Arrangement of Barricating With Sal ballies, Red Flag, Lab, T&P etc all Comp. | 110 | Rmt | 218 | ₹23,980 |
| 5 | 1st Class Brick Work with 1:3 Cement & Sand mortar & including Supply of lab, Mat,T&P etc all Comp. | 9.17 | Cum | 7,202.9 | ₹66,050.59 |
| 6 | 12 mm thick plaster with 1:3 cement & Sand mortar with Supply of lab, Mat, T&P etc all comp. | 32.4 | Sqm | 237.17 | ₹7,684.31 |
| 7 | Providing Bier to Retain Sewage water etc all Comp. | 6 | Nos | 450 | ₹2,700 |
| 8 | RCC Work with Cement, C.Sand & stone ballast in Prop. of 1:1.5:3 in Slab including Supply of Lab, Mat, T&P etc all comp. | 1.06 | Cum | 11,278.57 | ₹11,955.28 |
| 9 | Mild steel or Iron Work in Slab. | 0.83 | Qtl | 13,900 | ₹11,537 |
| 10 | Bailing Out of Water 5 HP Diesel Pump all Comp. | 8 | days | 470 | ₹3,760 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.83 MB
Tendernotice_2.pdf
PDF • 9.75 MB
BOQ_2249687.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .