Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹31.3 LAccepted-AOC | 1st | Accepted-AOC The lowest tender of M/s Vinayak Trading House has been accepted. | |
| 2 | 2nd₹33.3 L+₹2.0 L (6.38%)Rejected-Finance | 2nd | Rejected-Finance L2 | |
| 3 | 3rd₹36.2 L+₹4.9 L (15.6%)Rejected-Finance | 3rd | Rejected-Finance L3 | |
| 4 | 4th₹36.4 L+₹5.0 L (16.0%)Rejected-Finance 37 222 BUNDU KATRA AGRA UP | AGRA | UP | 4th | Rejected-Finance L4 |
Tender Value
₹39.1 L
EMD Value
₹78,200
Closing Date
5 Feb 2020, 6:00 pmClosed
GE AWC MHOW
GE AWC MHOW
OUTSOURCING OF SERVICES FOR OPERATION OF LIFTS AT GOSWAMI ENCLAVE AB ROAD MAP QTR AND VINDHYA VIHAR ENCLAVE NEAR DEMO SQN MAP QTR UNDER GE (AWC) MHOW
2020_MES_313906_1
8365 GE(AWC) /MHOW / OF 2019-20
Open Tender
Civil Works
Item Rate
330 days
GE AWC MHOW
All as per tender documents and NIT.
7 documents required · 7 mandatory
₹500
Yes
GE AWC MHOW
₹78,200
Yes
15 Feb 2020
11 Jan 2020
6 Feb 2020
11 Jan 2020
5 Feb 2020
27 Jan 2020
Amount
Operation of multiple passenger lift installed at MAP Md Accn Goswamy enclave AB road Block No CC-292 to 299, GE AWC Mhow in 3 shifts (each of 08 hrs) ( 1 st shift 0600 to 1400 hrs , 2nd shift 1400 to 2200 hrs and 3 rd shift 2200 to 0600 hrs) per day by deputing one lift operator per shift ( Total No of lift operator = 09 Nos ) including maintenance and cleaning in lifts as required , taking care of lifts from pilferage , theft , damage and reporting immediately breakdown of lifts to the Engr-in-Charge complete all as specified and as directed. Note:-(a) The contractor shall pay to his lift operators in their bank account and statement of bank account shall be submitted to GE for his verification while claiming interim payment. (b) The rates quoted shall deemed to be inclusive of minimum wages , all taxes (including GST,GST on work contracts, labour welfare cess/tax etc ), EPF for personals employed and also any other leviespayable under the respective statues.The contractor shall be required to submit the documentary proof of Employees Provident Fund (EPF) details for the personals employed. (c) The contractor will hand over lift to the department in good working condition on expiry of contract period. (d) 24 for hours operation time 1st shift 0600 to 1400 hrs , 2nd shift 1400 to 2200 hrs and 3 rd shift 2200 to 0600 hrs . Three shifts considered as one day. (e) The operator shall be ITI holder (full time) with minimum two years experience in the trade. (f) The contractor have to provide proper dress and shoes to the operator without any extra cost to the department. (g) One lift operator in each shift will look after maximum 05 Nos of lift. (h) In case of electrical breakdown the same operator shall operate the DG set. (j) The operator shall also be responsible for cleaning of lift and DG set including surrounding area. (k) The contractor shall provide reliever of lift attendant / lift operator as per labour rules and regulations.
Operation of multiple passenger lift installed at MAP Md Accn Vindhya Vihar enclave near Demo Sqn Block No CC-332 to CC-336, GE AWC Mhow in 3 shifts (each of 08 hrs) ( 1 st shift 0600 to 1400 hrs , 2nd shift 1400 to 2200 hrs and 3 rd shift 2200 to 0600 hrs) per day by deputing one lift operator per shift ( Total No of lift operator = 06 Nos ) including maintenance and cleaning in lifts as required , taking care of lifts from pilferage , theft , damage and reporting immediately breakdown of lifts to the Engr-in-Charge complete all as specified and as directed. Note:-(a) The contractor shall pay to his lift operators in their bank account and statement of bank account shall be submitted to GE for his verification while claiming interim payment. (b) The rates quoted shall deemed to be inclusive of minimum wages , all taxes (including GST,GST on work contracts, labour welfare cess/tax etc ), EPF for personals employed and also any other leviespayable under the respective statues.The contractor shall be required to submit the documentary proof of Employees Provident Fund (EPF) details for the personals employed. (c) The contractor will hand over lift to the department in good working condition on expiry of contract period. (d) 24 for hours operation time 1st shift 0600 to 1400 hrs , 2nd shift 1400 to 2200 hrs and 3 rd shift 2200 to 0600 hrs . Three shifts considered as one day. (e) The operator shall be ITI holder (full time) with minimum two years experience in the trade. (f) The contractor have to provide proper dress and shoes to the operator without any extra cost to the department. (g) One lift operator in each shift will look after maximum 05 Nos of lift. (h) In case of electrical breakdown the same operator shall operate the DG set. (j) The operator shall also be responsible for cleaning of lift and DG set including surrounding area. (k) The contractor shall provide reliever of lift attendant / lift operator as per labour rules and regulations.
Sameer Auto Engineers
MODI CORPORATION
PD GUPTA AND COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .