Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Renovation of Ponds/ Ooranies in Package No.224 Vembakkam Block of Tiruvannamalai District under State Finance Commission Grant for the year 2019-20
2020_RDTN_159482_1
Roc.No.A5/6726/2019 Dt.14.02.2020 224
Open Tender
Civil Works - Water Works
Lump-sum
180 days
Vembakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹71,800
22 Jun 2020
27 Feb 2020
24 Mar 2020
27 Feb 2020
24 Mar 2020
27 Feb 2020
Amount
Part 1 : Renovation of Kombu Kulam at Azhividaithangi
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 2 : Renovation of Anjaneyar Kulam at Kodayambakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 3 : Renovation of Patchai Kulam at Vembakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 4 : Renovation of Kallan kulam at Pulivalam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 5 : Renovation of Chandra Kulam at Thennampattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 6 : Renovation of Thoppu Kulam at Irumaram
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 7. : Renovation of Koil Kulam at Natteri
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 8 : Renovation of Thanneer Kulam at Perumanthangal
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 9 : Renovation of Ponniyamman Kulam at Perungattur
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 10 : Renovation of ADC Kulam at Ariyur
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 11 : Renovation of Chithanakal Kulam at Sirunavalpattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 12 : Renovation of Kulam at Siruvanjipattu
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 13 : Renovation of kuttai kulam at Moranam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 14 : Renovation of vembu kulam at Vadamanapakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 15 : Renovation of Seera Kulam at Vellakulam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 16. : Renovation of Seemariyan kulam at Sothiyampakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 17 : Renovation of chenjiyamman kulam at Arasanipalai
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 18 : Renovation of Varattu kulam at Vembakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
Part 19 : Renovation of Vannarakuttai at Sothiyampakkam
Clearing the juliflorajungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical
Earthwork in all type of soils expect hard rock requiring blastering and conveyingh for formation of bund with lead of 0 to 100m deploying earth mooving machineries and tippers including benching formation of bunds,breaking of clods and sectioning etc,complete.
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Plain Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Plain Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R. Elumalai
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .