| 1 | L1₹18.1 LAccepted-AOC THENI | TAMIL NADU | 625203 | ₹18.1 L | L1 | Accepted-AOC tender document |
| 2 | L2₹18.6 LRejected-Finance | ₹18.6 L | L2 | Rejected-Finance As Per Tender |
| Sl No | Description | Qty | Unit | P.Gopinathan L2 | Senthil K L1 |
|---|---|---|---|---|---|
| 1.01 | Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete. | 432 | sqm | 16.3 ₹7,041.60 | 6.3 ₹2,721.60 |
| 1.02 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 129.6 | sqm | 150.4 ₹19,491.84 | 140.4 ₹18,195.84 |
| 1.03 | Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc., | 366.05 | sqm | 33.3 ₹12,189.47 | 23.3 ₹8,528.97 |
| 1.04 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 110.93 | Cum | 2,426.3 ₹2.7 L | 2,416.3 ₹2.7 L |
| 1.05 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,109.25 | sqm | 95.8 ₹1.1 L | 85.8 ₹95,173.65 |
| 1.06 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 1,109.25 | sqm | 29.9 ₹33,166.58 | 19.9 ₹22,074.08 |
| 1.07 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 27.74 | Cum | 11,223.9 ₹3.1 L | 11,213.9 ₹3.1 L |
| 1.08 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 72 | Cum | 520.9 ₹37,504.80 | 510.9 ₹36,784.80 |
| 1.09 | Provision for HM Stone | 1 | No | 584.6 ₹584.60 | 574.6 ₹574.60 |
| 1.10Construction of Compound Wall ( sub Estimate -1 ) | |||||
Tender Value
Refer Docs
EMD Value
₹18,500
Closing Date
7 Jan 2026, 5:00 pmClosed
Block Development Officer VP
Panchayat Union Office Building, Bodinayakanur
Providing Compound Wall and BT Road in Anaikaraipatty Common Burial Ground at Anaikaraipatty Panchayat at Bodinayakkanur Block in Theni District under 15th CFC (VP) 2025-26
2025_RDTN_637574_1
3/2025-26 dated 23.12.2025
Open Tender
Civil Works - Others
90 days
Bodinayakkanur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,500
24 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision for HM Stone
Construction of Compound Wall ( sub Estimate -1 )
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with
Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Supplying fabricating and placing in position mild steel or ribbed steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete complying with standard specification
Reinforced Cement concrete 1:11/2:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with CM 1:3 12mm thick and with kraft paper without claiming extra etc. as directed by the Departmental officers complete complying with standard specification.
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Plastering in cm 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coat of Plastic emulsion paint over wall plastering surface with best approved first quality of approved colour over the one coat of priming etc., complete complying with standard specification (The paint should be got approved by the departmental officers before use on works )
Construction of Retaining Wall ( sub Estimate -2 )
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with
Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Cenetering Shuttering including necessary support for plane surface in foundation and Basement and in all floors usingmild steel sheets of size 90x60 cm and 10 gauge stiffened , welded with steel angles of size 25mmx 25mmx3mm for boarding laid over silver
Plain Cement Concrete in CM 1 : 3 : 6 mix using 40 mm gauge hard brocken granite stone jellay for foundation including watering wherever necessary and laid in layers not more than 15 cm thick compacting et., complete complying with standard specification
Provision for PVC Pipe for Wheep holes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P.Gopinathan (BID ID -1555890)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_763035.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid