Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | ₹9.2 L | L1 | Admitted-Finance |
| 2 | L2₹9.4 L+₹24,989 (2.73%)Admitted-Finance | ₹9.4 L+₹24,989 (2.73%) | L2 | Admitted-Finance |
| 3 | L3₹9.5 L+₹36,780 (4.02%)Admitted-Finance | ₹9.5 L+₹36,780 (4.02%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Eligible for part 1 |
| Sl No | Description | Qty | Unit | ALOK KUMAR SINGH L2 | M/S SATYAM TRADING COMPANY L3 | ANCHAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | Eye Bolts for Guard wire | 104 | Nos. | 81 ₹8,424 | 85 ₹8,840 | 80 ₹8,320 Lowest |
| 1.02 | 11 KV X- Arm Holding Clamp | 56 | Nos. | 352 ₹19,712 | 355 ₹19,880 | 350 ₹19,600 Lowest |
| 1.03 | Holding Clamp for for T-off Channel x-arm & F- Bracket with Bolt & Nut . | 55 | Nos. | 256 ₹14,080 | 260 ₹14,300 | 255 ₹14,025 Lowest |
| 1.04 | Stone Pad . | 55 | Nos. | 76 ₹4,180 | 80 ₹4,400 | 75 ₹4,125 Lowest |
| 1.05 | Three Phase Distribution Box Clamp with Nut & Bolt | 110 | Nos. | 452 ₹49,720 | 455 ₹50,050 | 450 ₹49,500 Lowest |
| 1.06 | LT Shakle Insulator. | 192 | Nos. | 80 ₹15,360 | 80 ₹15,360 | 75 ₹14,400 Lowest |
| 1.07 | Bolt & Nut for Shakle Insulator. | 384 | Nos. | 200 ₹76,800 | 200 ₹76,800 | 195 ₹74,880 Lowest |
| 1.08 | LT Clamp with Nut & Bolt | 384 | Nos. | 325 ₹1,24,800 | 325 ₹1,24,800 | 320 ₹1,22,880 Lowest |
| 2.00Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx) | ||||||
Tender Value
₹9.5 L
EMD Value
₹9,500
Closing Date
16 Jul 2026, 5:00 pmClosed
SE, EDC, Ayodhya
EDC, Civil Liens, Ayodhya.
46/EDC(Ayodhya)/2026-27
2026_MVVNL_1164890_1
46/EDC(Ayodhya)/2026-27
Open Tender
Electrical Works
Item Wise
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE, EDC, Ayodhya
₹9,500
23 Jul 2026
30 Jun 2026
17 Jul 2026
30 Jun 2026
16 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part - A ( Material) Following Material Supplied by the Contractor:- | |||||
| 1.01 | Eye Bolts for Guard wire | 104 | Nos. | 100 | ₹10,400 |
| 1.02 | 11 KV X- Arm Holding Clamp | 56 | Nos. | 101 | ₹5,656 |
| 1.03 | Holding Clamp for for T-off Channel x-arm & F- Bracket with Bolt & Nut . | 55 | Nos. | 102 | ₹5,610 |
| 1.04 | Stone Pad . | 55 | Nos. | 101 | ₹5,555 |
| 1.05 | Three Phase Distribution Box Clamp with Nut & Bolt | 110 | Nos. | 102 | ₹11,220 |
| 1.06 | LT Shakle Insulator. | 192 | Nos. | 103 | ₹19,776 |
| 1.07 | Bolt & Nut for Shakle Insulator. | 384 | Nos. | 104 | ₹39,936 |
| 1.08 | LT Clamp with Nut & Bolt | 384 | Nos. | 105 | ₹40,320 |
| 2Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
TenderForm46.pdf
Tender Documents • 0.94 MB
BOQ_2184552.xls
BOQ • 0.26 MB
Dateextend.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .