| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L | L1 | Accepted-AOC Quoted Lowest Rate |
| 2 | L2₹8.2 LRejected-Finance | ₹8.2 L | L2 | Rejected-Finance Quoted Higher Rate |
| 3 | L3₹8.2 LRejected-Finance AUCKLAND ZIGZAG ROAD MERRY VILLA DARJEELING | DARJEELING | DARJEELING | WEST BENGAL | 734101 | ₹8.2 L | L3 | Rejected-Finance Quoted highest Rate |
Tender Value
₹8.1 L
EMD Value
₹16,212
Closing Date
17 Feb 2026, 9:00 amClosed
Executive Engineer, PRDD, GTA
PANCHAYAT AND RURAL DEVELOPMENT DEPARTMENT, LUICES JUBLEE COMPLEX DARJEELING
Construction of Burning Ghat, Malami Shed and other aiiled work at Chota Poobong Busty, Sukhia,Plungdung GP, Jorebonglow-Sukhiapokhari Dev. Block GTA.
2026_GTA_1002614_5
19(NIeT)/PRDD (15CFC)/ZP/T/UtF)/GTA/2025-26
Open Tender
CIVIL WORKS
90 days
Jorebunglow Sukhiapokhri Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹16,212
13 Apr 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initiallead of 50m and initial lift of 1.5m(Mode of measurement: pre works and post works)
In mixed soil (i,e. clay mixed with kankar, pebbles,moorum etc.)
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
(a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor.
(B) With N.B variety stone metal.
(a) 1:3:6 proportion.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
(ii) River bazree.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
other than SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel
(A) M.S. structural works with hollow in roof trusses with tubular sections (TATA make suare or rectangular shape conforming to IS: 806- 1957 & IS: 1161- 1958) connected to one another with bracket,gusset,cleats as per design, drawing & direction of Engineer-In-Charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS: 814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour required for execution and all incidental charges (such as electricity, labour insurance) etc. complete.(Payment to be made on the basis of calculated weight of structural members of M.S. Hollow section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of suc
(i) For roof truss works.
(a) Span up to 12 Mtr.
M.S structural work in colums, beams etc. with simple roled structural members (e.g. joints angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineering -in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc weldingconforming to IS: 816 - 1956 & IS :1995 using electrodes of approved make and brand conforming to IS: 814 - 1957, haulage, hoisting and erections all complete. the rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidential charges such as electricity charges, labour incurance charges etc.(Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for Gusset, bracket, cleat, rivets, bolts and nuts may be make by adding
(I) For structural members/built up sections of specified sections weighing less than 22.5kg./m.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor). .
(i) in Roof:-.
(b) With 0.63 mm.thick sheet.
Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor). .
(ii) in wall.
(b) With 0.63 mm.thick sheet.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion.
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
(i) with 1:6 cement mortar.
(a) 25 mm. thick plaster.
Add 18% GST
Add 1% Labour Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_2457405.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid