Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
29 May 2021, 12:00 pmClosed
EE ETD MEERUT
EE ETD PARESHAN BHAWAN 130 D VICTORIA PARK MEERUT
RESAGING OF ZEBRA CONDUCTOR BETWEEN TOWER LOC NO 41 42 OF 220 KV HAPUR PARTAPUR JAGRITI VIHAR DC TRANSMISSION LINE
2021_UPTCL_588599_1
VERY SHORT TERM ETD MT T 04 2021 22
Open Tender
Electrical Works
Item Wise
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MEERUT
₹2,000
3 Jun 2021
21 May 2021
29 May 2021
21 May 2021
29 May 2021
21 May 2021
Amount
The following work shall be carried out on 220 KV D/C Hapur-Partapur (Jagriti Vihar) transmission line under ETD-MEERUT Opening & Dismantling of jumper by cutting / opening of PG clamp/ jumper cone on both side lowering down of ACSR zebra conductor by re-hoisting of all necessary hardware accessories & jumper using by special T&P after taken tension load of conductor laying in complete section of different numbers of span and replacement of damaged/extra conductor Dead End having melted jumping clamp by cutting of approx. 5Mtr old ASCR zebra conductor and fitting fresh dead End at suitable major length stringing of ASCR Zebra conductor by hoisting of all the necessary hardware, accessories & jumper using special T&P for taking load of lowered down conductor then clipping Dead End fitting with Disc insulator string to cross Arm plate. After releasing load of whole section & providing/ fitting fresh jumper by compressing jumper cone at both end of conductor of suitable length and as detailed here under.
220 KV HAPUR-PARTAPUR circuit-I tower location no. 41-42 RYB Phase
220 KV HAPUR-PARTAPUR circuit-II tower location no. 41-42 RYB Phase
Transportation of all material form JE store to work place and shifting of all dismantled material and balance material from work place to JE store including labour and suitable means of transportation.
M/S AJAY TOMAR CONTRACTOR
Hi-tech power transmission
KARAN SINGH
RAHUL ELECTRIC ENGGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .