| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC AT WARD NO 05 NEAR NAMDA GOPAL SWEET STALL P O ARUNODAYA MARKET P S BADAMBADI DIST CUTTACK PIN 753012 | CUTTACK | ODISHA | 753012 | ₹1.6 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.6 CrSame as L1Rejected-AOC | ₹1.6 CrSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.6 Cr+₹3.1 L (2.00%)Rejected-AOC | ₹1.6 Cr+₹3.1 L (2.00%) | L3 | Rejected-AOC Rejected |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
13 Mar 2026, 5:00 pmClosed
Executive Engineer, CD-I
At Bikash Bhawan, Jagannathlane, Badambadi, Cuttack 753012
Renovation and Beautification of Lala Matha Pond at Sheikh Bazar in Ward No. 14.
2026_ORULB_126473_1
MC(CMC)CTC_Div-I_No.24/2025-26
Open Tender
Civil Works - Others
Percentage
240 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹1.6 L
Yes
25 Aug 2026
25 Feb 2026
18 Mar 2026
25 Feb 2026
13 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-Watering:-Suplying all materials, labours, T&P, 5.00 HP Diesel Pump set with POL, Pump Operator etc. and De-watering the clear water/muddy water etc. all complete as per the required specification and direction of Engineer in charge | 66.67 | Hr | 200.7 | ₹13,380.67 |
| 2 | De-Weeding:-Supplying all material, labour and T&P etc by removing rank floating Vegetation and uprooting the vegetation by digging upto a depth of 60cm, if required and removal of all types of weeds and other vegetation growth by forking repeatedly breaking clots,rough dressing,uprooting fresh growth after 10-15 days and fine dressing for planting new approved grass including cost of removing of all rubbish materials with all leads and lifts etc. all completed as per the required specifications and direction of Engineer-in-Charge. | 4,900 | Sqm | 44.54 | ₹2,18,246 |
| 3 | De-Silting :- Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification. | 10,000 | Cum | 66.38 | ₹6,63,800 |
| 4 | Carriage of Silt including all cost complete | 5,000 | Cum | 344.52 | ₹17,22,600 |
| 5 | Trimming of slopes and bed to design section :-Supplying all materials labour T&P, Excavation of any available type of soil by mechanical means loading into and transportation by mechanical means and unloading the soil within the Pond Area on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering and compaction by mechanical means but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc. complete as per the required specification and direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.) | 2,400 | Cum | 66.38 | ₹1,59,312 |
| 6 | Supplying all materials labour T&P, Watering earthwork upto OMC condition and compaction by Mechanical means in layars not exceeding 22.5Cm to 95% dry density including hire and running charges of all the Machineries complete as per the direction of EIC (AoR-2006, Page no-12, item No.2) | 3,900 | Cum | 47.85 | ₹1,86,615 |
| 7 | Supplying all materials , Labour, T&P and Fine dressing of earthwork in odinary or hard soil in road / Embankment formation including cost of cutting of filling earth upto 0.15 depth of surface etc all complete as per the required specifications and direction of Engineer in Charge. | 2,340 | Sqm | 5.37 | ₹12,565.8 |
| 8 | Earth work in all kinds of soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7 cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer in charge (AoR page no-2 ,item no-2.a) Outlet / In let | 27 | Cum | 299.52 | ₹8,087.04 |
| 9 | Supplying all materials, labour and T&P etc. and providing and laying pre-cast RCC Hume Pipe, Class-NP2 suitable for collar joint conforming to I.S : 458/2003, including transportation of all materials to site and as directed by the Engineer-in-charge, all complete. | 15 | Mtr | 7,274.2 | ₹1,09,113 |
| 10 | Supplying all labour and T&P etc Rough stone dry packing in approns and revetments with hard granite stones (15cm to 30cm).including cost , conveyance of all materials.as per the specification and direction of Engineer-in- charge, all complete. | 54 | Cum | 2,246.5 | ₹1,21,311 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.82 MB
BOQ_582945.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .