| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC GRAM KISHUNDASAPUR JANPAD AZAMGARH UTTAR PRADESH | AZAMGARH | AZAMGARH | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.9 L+₹1.5 L (7.30%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
5 Jan 2022, 9:00 amClosed
E.E.I.D.CHUNAR, MIRZAPUR
Executive Engineer Irrigation Chunar Mirzapur
LAYING 900 MM DIA. R.C.C. HUME PIPE LINE (NP-3) IN NUNAUTI LEFT CANAL FROM KM. 2.000 TO KM. 3.200
2021_UPIDC_659384_2
06/E.E./2021-22
Open Tender
Civil Works
Item Rate
30 days
Tahseel Chunar Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹45,000
19 May 2022
30 Dec 2021
6 Jan 2022
30 Dec 2021
5 Jan 2022
30 Dec 2021
Amount
Earth Work in excavation for making plateform in all type of soil including initial lead and lift with proper compaction and disposal.
Preparation of sub grade for laying C.C.
Providing and laying of local sand in filter including cost of all material and T&P etc.
Providing and laying of C.C. (1:3:6) with Coarse sand FM more than 2.2 and 25 mm to 50 mm size stone ballast including cost of all labour, material and T.&P. etc. required for proper completion of work.
Laying and fixing of 1200 mm dia R.C.C. hume pipe (NP-3) including cost of all material, labour and T.&P. etc. complete in all respects.
Centering and Shuttering for tank including cost of all material, labour T&P etc.. Required for proper completion of work.
Supply, laying and fixing of 150 mm R.C.C. gul pipe including cost of all material, labour and T.&P. etc. complete in all respects.
Providing and laying of Reinforced Cement Concrete in (1:1.5:3) in with coarse sand FM more than2.0 and 4.75 mm to 20 mm size hard stone dala grit including cost of all labour, material and T.&P.etc. required for proper completion of work.
Cutting ,bending, binding and placing of reinforcement in position of including cost of all labour, material and T & P ,binding wire for proper completion of work.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .