Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹20.5 L+₹4,738 (0.23%)Rejected-Finance 19 A NIRUPAMA DEVI ROAD LANE 1 BERHAMPORE MURSHIDABAD | BERHAMPORE | MURSHIDABAD | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹20.5 L+₹8,625 (0.42%)Rejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | L3 | Rejected-Finance Higher than L1 | |
| 4 | L4₹20.5 L+₹9,345 (0.46%)Rejected-Finance BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | L4 | Rejected-Finance Higher than L1 |
Tender Value
Refer Docs
EMD Value
₹41,500
Closing Date
25 Jan 2025, 4:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Repairing, thorough servicing re-installation of HT Automatic Voltage Regulator at Rajnagarghat Intake Sub- Station within Southern Sector of Arsenic Area W/S Scheme under Malda Mechanical Division, P.H.E. Dte.
2025_PHED_794476_1
WBPHED/EE/MLMD/NIeT_33 of 2024-2025
Open Tender
Electrical Work/ Equipment
Item Rate
30 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹41,500
Yes
21 Feb 2025
7 Jan 2025
27 Jan 2025
7 Jan 2025
25 Jan 2025
7 Jan 2025
Amount
Inspection & Testing charges for Fault Identification of 800 KVA HT AVR.
Transportation charges for carrying the complete AVR Unit (Buck-Boost, Step Up & Down Unit and Regulator unit) from site to the workshop at kolkata including loading and unloading charges.
BUCK BOOST & STEP UP DOWN UNIT
Labour charges for dismantling of Core & coil assembly from Buck Boost & Step Up Down unit.
Supply delivery of copper wire for Insulation of 2 nos. burnt phases “Y” & “B” of Step down unit (LT coils), approx copper requirement is 80 Kgs.
Supply delivery of copper wire for Insulation of 1 no. burnt phases “Y” of Buck Boost unit (HT & LT both), approx copper requirement 55 Kgs.
Supply & replacement of Breather with 1 kg. silica gel.
Supply and top up of New transformer oil for Buck Boost and Step Down tank for final testing (IR value, magnetic balance, ratio, magnetizing current, core loss, copper loss, high voltage test, double voltage double frequency & OTI, WTI, Buchholz relay operational test)
Rectififcation of whole Buck Boost Step up/down assembly by inserting newly wooven coils in the tank after cleaning necessary jointing replacemant of Gasket & Seal assambly making inter connetion with bushing all complete by deputing Service Engineer having exprience in Automatic Voltage regulator unit(HT).
Charges for Final Testing (IR value, magnetic balance, ratio, magnetizing current, core loss, copper loss, high voltage test, double voltage double frequency & OTI, WTI, Buchholz relay operational test)
REGULATOR UNIT
Labour charges for dismantling of Core & coil assembly from Regulator unit.
Supply delivery of copper wire for Insulation of 3 nos. burnt coils out of total 6 nos. coils of Regulator unit (2 coils of Regulator – 1 & 1 coil of Regulator – 2), approx copper involvement 294 kgs.
Supply & replacement of Regulator press board cylinder, bakelite strips, cotton tape & all regulator assembly related material.
Supply and top up of New transformer oil for Buck Boost and Step Down tank for final testing (IR value, magnetic balance, ratio, magnetizing current, core loss, copper loss, high voltage test, double voltage double frequency & OTI, WTI, Buchholz relay operational test)
Supply & replacement of PCB relay card.
Supply and delivery of 50 sq. mm. X S/C Cu. Flex. Cable.
Supply and delivery of Cu. Lugs for 50 sq. mm. S/C cable.
Supply and delivery of Empire tape.
Supply & replacement of voltage controller potentiometer.
Supply & replacement of Aux. Contactor.
Supply & replacement of Limit Switch.
Supply & replacement of Carbon Roller.
Supply & replacement of Tag & Tail assy.
Supply & replacement of 630 Amp. Porcelain bushing, 1100 V
Supply & replacement of Nylon Sprocket.
Supply & replacement of M.S. Sprocket
Supply & replacement of Heavy duty Chain
Supply & replacement of Breather with 1 kg. silica gel
Supply & replacement of Clutch Declutch handle of Motor
Rectififcation of whole regulator unit assembly by inserting newly wooven coils in the tank after cleaning necessary jointing replacemant of Gasket & Seal assambly making inter connetion with bushing all complete by deputing Service Engineer having exprience in Automatic Voltage regulator unit(HT).
Transportation charges for carrying the complete AVR Unit (Buck-Boost, Step Up & Down Unit and Regulator unit) from the workshop at kolkata to working site including loading and unloading charges.
Re-commissioning of HT AVR at site after completion of necessary testing at site & power charging.
Charges for Final Testing (IR value, magnetic balance, ratio, magnetizing current, core loss, copper loss, high voltage test, double voltage double frequency & OTI operational test)
Cost of Scrap (Copper) will be deducted during preparation of Bill @ Rs. 750.00/ kg
Add GST @ 18%
Add Cess @ 1%
M/S. Sajahan Chowdhury (BID ID -6006553)
HANNAN BUILDERS PRIVATE LIMITED (BID ID -5977160)
NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. (BID ID -6004670)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .