Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | -25.20% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹20,615.52 (12.9%)Admitted-Finance | -15.57% | ₹1.8 L+₹20,615.52 (12.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 L+₹32,539.56 (20.3%)Admitted-Finance | -10.00% | ₹1.9 L+₹32,539.56 (20.3%) | L3 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹6,500
Closing Date
3 Aug 2026, 2:00 pmClosed
XEN PHE DIVISION SHOPIAN
PHE Division Batpora Shopian
Stabilization of twin RWMs affected due to cloud burst at Kilbal feeding to Sedow under WSS Sedow old under M and R
2026_PHE_317306_1
14/JSDS 2026-27
Open Tender
Civil Works - Water Works
Percentage
XEN PHE DIVISION SHOPIAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
XEN PHE DIVISION SHOPIAN
₹6,500
4 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 567 | Cum | 187.3 | ₹1,06,199.1 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 123 | Cum | 256.85 | ₹31,592.55 |
| 3 | Laying in position centrifugally cast (spun) iron S&S or flanged pipes (excluding cost of pipe) 150 mm Dia | 45 | Quintal | 270.1 | ₹12,154.5 |
| 4 | Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket.
150 mm dia pipes | 33 | Each | 150.35 | ₹4,961.55 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 98 | Cum | 218.4 | ₹21,403.2 |
| 6 | Providing and fixing of MS flanged (12 mm thick) to double flanged GI/DI pipes including cutting of pipes, welding charges, cutting of flanges, rubber gaskets, bolts, nuts including testing of joint and sorts of carriages complete job 100 mm dia | 15 | Joint | 1,520 | ₹22,800 |
| 7 | Providing fixing DI Rubber gaskets to DI pipes including coast of rubber gaskets, carriahges from source to site complete job 150 mm Dia | 40 | No | 100 | ₹4,000 |
| 8Carriage of materials from source upto damping site by mechnical transport including loading and unloading & Stacking | |||||
| 8.1 | 100 mm Dia GI pipe upto 16 Km | 75 | 100m | 7.81 | ₹585.75 |
| 9Extra Carriage of materials from source upto damping site by mechnical transport including loading and unloading & Stacking | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Nit14.pdf
Tender Documents • 1.02 MB
BOQ_1039216.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .