Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.5 L
Closing Date
19 Aug 2021, 2:00 pmClosed
Exectuive Engineer EDD,Leh
Office of the Executive Engineer EDD,LEH
Supply, Installation, Testing and Commissioning for replacement of 8mtr. Pole to 9 mtr. Pole at every road crossing from Upshi to Gya meru 11KV line of Changthang section on full turnkey basis under SDP Budget 2021-22
2021_PDNRE_3988_1
NIT NO. 80 of ED Leh of 2021-22
Open Tender
Electrical Works
Turn-key
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer EDD Leh
Exempted
4 Jan 2022
6 Aug 2021
20 Aug 2021
7 Aug 2021
19 Aug 2021
7 Aug 2021
Amount
Replacement of 8 Mtr. Pole by 9 Mtr pole
9 Mtr. Long Pole,ST-410 SP33)
GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
30 mm² ACSR Conductor (single conductor length)
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
Galvinized Nuts and Bolts
Danger Plates with Clamps
Anti-Climbing Device with Clamps
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
Red Oxide
Aluminium Paint
Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
11KV Link Set 200Amp as per REC Standard.
M/S LOBZANG GURMET GOVT CONTRACTOR
M/S CHHEIRPON ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .