| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.5 Cr+₹15.6 L (6.64%)Rejected-Finance | ₹2.5 Cr+₹15.6 L (6.64%) | L2 | Rejected-Finance L2 Bidder |
| 3 | Not Admitted-PreQual/Technical 3 3806 KAPIL VIHAR PAPERMILL ROAD SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHARMA LIGHT HOUSE L2 | ELECTRICAL and MECHANICAL WORKS L1 |
|---|---|---|---|---|---|
| 1.00Outsourcing the work of Routine & Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at Power House No.- 1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara | |||||
| 1.01 | Lump-sum rates for Routine, Preventive Maintenances, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards, Bays and other allied equipment at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. (Refer Note-1 below & DNIT Clause No.1.7) | 12 | Months | 3,82,000 ₹1,83,36,000 | 3,75,000 ₹1,80,00,000 Lowest |
| 1.02 | Lump-sum monthly rates for deployment of additional manpower by contractor for 60 Days during annual shutdown period (tentatively between March to May) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-4) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, Talwara. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-2 below & DNIT Clause No.1.7) | 2 | Months | 2,08,750 ₹16,70,000 | 2,07,000 ₹16,56,000 Lowest |
| 1.03 | Lump-sum monthly rates for providing assistance for 90 Days during rainy season (tentatively between June to Sept) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-5) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-3&4 below & DNIT Clause No.1.7) | 3 | Months | 1,01,500 ₹12,18,000 | 1,00,600 ₹12,07,200 Lowest |
| Sl.NoBidder Name | |||||
| 1 | SHARMA LIGHT HOUSE (BID ID -644351) | 2,08,63,200 | Not Quoted | - | - |
| 2 | ELECTRICAL and MECHANICAL WORKS (BID ID -644552) | 2,08,63,200 | 20842337.00 | - | - |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
22 May 2025, 3:00 pmClosed
SE MHP Talwara
Sector-3 MHP Talwara Distt-Hoshiarpur
Outsourcing the work of Routine, Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at PH 1 to 4 of Mukerian Hydel Project PSPCL Talwara PB
2025_POWER_138769_1
01/SE/MHP/P-428
Open Tender
Electrical Works
Tender cum Auction
365 days
MHP Talwara
As per DNIT
3 documents required · 3 mandatory
₹2,360
Yes
₹3.9 L
Yes
5 Sept 2025
17 Apr 2025
26 May 2025
17 Apr 2025
22 May 2025
21 Apr 2025
Amount
Outsourcing the work of Routine & Preventive Maintenance, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards and other allied equipment through contractor at Power House No.- 1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara
Lump-sum rates for Routine, Preventive Maintenances, Breakdown Maintenance and Annual Overhauling of Generating Units, Switchyards, Bays and other allied equipment at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. (Refer Note-1 below & DNIT Clause No.1.7)
Lump-sum monthly rates for deployment of additional manpower by contractor for 60 Days during annual shutdown period (tentatively between March to May) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-4) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, Talwara. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-2 below & DNIT Clause No.1.7)
Lump-sum monthly rates for providing assistance for 90 Days during rainy season (tentatively between June to Sept) considering deployment of minimum manpower as given in Section-VI-Table 6.1 (Column-5) at Power House No.-1 to 4 of Mukerian Hydel Project Stage-I, PSPCL, Talwara (Pb) as per tender specifications. Monthly rates shall be quoted considering the month of 30 Days. (Refer Note-3&4 below & DNIT Clause No.1.7)
Bidder Name
Amount in Words
SHARMA LIGHT HOUSE (BID ID -644351)
ELECTRICAL and MECHANICAL WORKS (BID ID -644552)
SHARMA LIGHT HOUSE (BID ID -644351)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .