Tender Value
₹59.1 L
EMD Value
₹59,000
Closing Date
28 May 2020, 4:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Elachipalayam Block in Namakkal District under NABARD XXV Package 2
2020_RDTN_163486_2
1785/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Elachipalayam Block
Class I
3 documents required · 3 mandatory
₹0
₹59,000
Yes
DRDA, Namakkal
1 Jun 2020
13 May 2020
28 May 2020
13 May 2020
28 May 2020
20 May 2020
20 May 2020
Amount
Strengthening the road from Kunnangalputhur to Mavureddipatty KM 0/0-3/06(R33/VPR) H/O Akkalampatty
Clearing Scrub Jungles and removing them by burrying or burning etc., completed as per Sl. No.2
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying W.B.M 75 mm Consolidated Thickness With Grade III Metal using 1.00 Cum of 63mm -11.20 mm IRC HG Metal with 0.24Cum of Gritty Gravel for blindage including all charges etc.,
Providing and laying Tack coat over the W.B.M surface using 4Kgs. of Emulsion Bitumen for 10 Sqm area etc., complete.
Providing and laying Premix carpet with sealcoat Type A to 20 mm Consolitated etc., complete as per clause 509 of MOST Specification.
Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1 : 4 : 8 mix using 40mm Metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Cement concrete 1 : 3 : 6 mix using 40 MM metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and Centering for all Works including cost and conveyance of all materials to site and all labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MSV Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .