Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.4 LAccepted-Finance 1 NO MOHISHILA COLONY DAKSHIN PARA ASANSOL 3 PASCHIM BARDHAMAN 713303 | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | l1 | Accepted-Finance l1 | |
| 2 | L2₹1.4 L+₹2,055.53 (1.50%)Rejected-Finance GANRAPOTA BONGAON NORTH 24 PGS PIN 743251 | BONGAON | NORTH 24 PARGANAS | WEST BENGAL | 743251 | L2 | Rejected-Finance l2 | |
| 3 | l3₹1.4 L+₹3,425.89 (2.50%)Rejected-Finance 26 A G M ROAD KOLKATA 700086 | KOLKATA | KOLKATA | WEST BENGAL | 700086 | l3 | Rejected-Finance l3 |
Tender Value
₹1.4 L
EMD Value
₹2,750
Closing Date
2 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER(C)/BR-VIII
172/5, R.B. AVENUE, KOL-29
CONSTRUCTION OF TEMPORARY WATER RESERVOIR FOR CHHAT PUJA PREPARATION AT 17,C.M. LN , KOLKATA -26 IN K.M.C. WARD NO - 88,BR-VIII.
2026_KMC_1045272_1
KMC/EEC/VIII/088/008/26-27/R
Open Tender
CIVIL WORKS
Percentage
15 days
WARD - 088
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,750
5 Nov 2026
9 Oct 2026
4 Nov 2026
9 Oct 2026
2 Nov 2026
9 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.81 | %M3 | 11,927 | ₹9,684.72 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 10.97 | M3 | 5,575 | ₹61,168.9 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 54 | SQM | 161 | ₹8,694 |
| 4 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 54 | SQM | 34 | ₹1,836 |
| 5 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 11.76 | M3 | 447 | ₹5,257.17 |
| 6 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 8.1 | SQM | 19 | ₹153.9 |
| 7 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 0.81 | %M3 | 7,754 | ₹6,280.74 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC.B. MISCELLANEOUS ITEMS 1 Labour for Chipping of concrete surface before taking up Plastering work. | 81 | SQM | 21 | ₹1,701 |
| 9 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. | 82.81 | SQM | 244 | ₹20,205.64 |
| 219 | Sub Total | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_2562637.xls
BOQ • 0.34 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
TF.pdf
Tender Documents • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .