| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-AOC | ₹13.0 L | L1 | Accepted-AOC RESPONSIVE |
| 2 | L2₹13.0 L+₹649.51 (0.05%)Rejected-AOC 0 CANAL ROAD ASHA NAGAR HARDOI HARDOI UTTAR PRADESH 241001 | HARDOI | UTTAR PRADESH | 241001 | ₹13.0 L+₹649.51 (0.05%) | L2 | Rejected-AOC RESPONSIVE |
Tender Value
₹13.0 L
EMD Value
₹26,000
Closing Date
11 May 2026, 12:00 pmClosed
E.E.R.E.D. HARDOI
E.E.R.E.D. HARDOI
GRAM PUSPTALI MAJRA BHADHAYAL VIKAS KHAND TADIYAWAN ME JAL NIKASI HETU NALI NIRMAN
2026_REDUP_1138906_1
LETTAR NO 2411 DATE 31.03.2026
Open Tender
Civil Works
Percentage
90 days
HARDOI
GRAM PUSPTALI MAJRA BHADHAYAL VIKAS KHAND TADIYAWAN ME JAL NIKASI HETU NALI NIRMAN
2 documents required · 2 mandatory
₹944
₹26,000
Yes
3 Jul 2026
21 Apr 2026
11 May 2026
21 Apr 2026
11 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in Foundation in Ordinary Soil SI No. 251 | - | Cum | - | - |
| 2 | P/L of cement concrete 1:6:12 ( 1 cement : 6 fine sand : 12 graded brick aggregate 40mm nominal size ) and curing complete, i/c cost of formwork in foundation and floors.as per S.I.No. 273 | - | Cum | - | - |
| 3 | Class M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth i/c supply of all materials, labour and T&P etc. required for proper completion of the work. as per direction of E/I S.I.305b | - | Cum | - | - |
| 4 | 12 mm. Cement plaster in 1:4 with cement and coarse sand mortar in single coat on fair side of single or half brick wall for interior plastering up to floor two level i/c internal rounded angles champhers and or rounded angles not exceeding 80 mm in grith and finished even and smooth no extra for mixing any additive.S. I. No 13.4.1 | - | sqm | - | - |
| 5 | Providing and laying of P.C.C. Work in 1:2:4 , cement , coarse sand , 20 mm gauge stone grit of not less than strength of M - 150 and curing complete I/c all material , labour and T & P etc. . required for proper completion of the works . S. I. No. 279b | - | Cum | - | - |
| 6 | Providing and laying of R.C.C. work with cement , approved coarse sand and 2cm gauge stone ballast in the proportion 1:2:4 (1 cement : 6 aggregate ) in lintels of doors and windows excluding supply of reinforcement and its bending but i/c its fixing and binding wire and i/c necessary centering and shuttering etc. and also i/c supply of all materials, labour and T&P etc. required for proper completion of the works strength of the concrete shall not be less than M-150 as per SI No. 284 | - | Cum | - | - |
| 7 | Mild steel or Iron in Plain such as R.C.C. and R.B. work (when not included in an over all rates ) wrought to required shape as necessary i/c bending for proper completion of the work and i/c supply of steel its wastage bend hooks authorised over lapping shall be measured upto floor two level. as per SI No. 504 | - | QTL | - | - |
| 8 | Provision for sign board as per Approved By S.E. | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_2126418.xls
BOQ • 0.24 MB
T-1.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .