| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC Tender submitted by Sahayathatheyoush contractor is less then minus 19 percent of tender value Hence the tender is accepted |
| 2 | L2₹9.8 L+₹9,750 (1.00%)Rejected-Finance | ₹9.8 L+₹9,750 (1.00%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹10.1 L+₹35,431 (3.65%)Rejected-Finance | ₹10.1 L+₹35,431 (3.65%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹10.3 L+₹55,267.40 (5.69%)Rejected-Finance | ₹10.3 L+₹55,267.40 (5.69%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹10.3 L+₹56,452.84 (5.82%)Rejected-Finance 19 96A PERUNGODU NEYYOOR | ₹10.3 L+₹56,452.84 (5.82%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | RESAL CONTRACTORS L7 | SELVA VARGHEESE L8 | ALEXANDER CONSTRUCTIONS L4 | Subash L5 | CHELLIAN THANGANADAR L6 | S SRINIVASAN(WORKS CONTRACTOR) L3 | IAAS CONSTRUCTIONS L2 | SAHAYA THAYTHEYOUSH L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete. (Narrow Foundation - First Depth upto 2 metre) | 148 | m³ | 180 ₹26,640 | 200 ₹29,600 | 176 ₹26,048 | 224.21 ₹33,183.08 | 224.24 ₹33,187.52 | 195 ₹28,860 | 90 ₹13,320 Lowest | 100 ₹14,800 |
| 2.00 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Mechanical Means | 25.5 | m³ | 5,200 ₹1,32,600 | 5,310 ₹1,35,405 | 4,745 ₹1,20,997.5 | 4,511.53 ₹1,15,044.02 | 4,512.06 ₹1,15,057.53 | 4,412 ₹1,12,506 | 4,500 ₹1,14,750 | 4,000 ₹1,02,000 Lowest |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 238 | m² | 333 ₹79,254 | 300 ₹71,400 | 297.8 ₹70,876.4 | 283.21 ₹67,403.98 | 283.24 ₹67,411.12 | 510 ₹1,21,380 | 270 ₹64,260 | 250 ₹59,500 Lowest |
| 4.00 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 79 | m³ | 5,000 ₹3,95,000 | 5,300 ₹4,18,700 | 4,985 ₹3,93,815 | 5,219.75 ₹4,12,360.25 | 5,220.36 ₹4,12,408.44 | 4,105 ₹3,24,295 Lowest | 4,950 ₹3,91,050 | 4,900 ₹3,87,100 |
| 5.00 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 54 | m² | 274 ₹14,796 | 200 ₹10,800 | 255 ₹13,770 | 274.83 ₹14,840.82 | 283.36 ₹15,301.44 | 236 ₹12,744 | 180 ₹9,720 Lowest | 200 ₹10,800 |
| 6.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29 m height for plain surfaces such as RCC slabs rectangular beams Tee or L beams lintels, stair case beam etc. in all floors with all cross bracing using mild steel sheets of size 90x60 cm and BG10 gauge stiffended with welded mild steel angles of size 25x25x3 mm for boarding laid over silver oak country wood joists of size 10x6.5 cm spaced at about 90 cm center to center and supported with casurina props of 10 cm to 13 cm Ø spaced at 75 cm center to center etc. complete complying with standard specification in all floors. TNDSS No:30&36 | 75 | m² | 333 ₹24,975 | 670 ₹50,250 | 595 ₹44,625 | 626.2 ₹46,965 | 626.27 ₹46,970.25 | 888 ₹66,600 | 270 ₹20,250 Lowest | 500 ₹37,500 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel/Ribbed T or Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe500, Fe550D, Fe500D etc for all RCC works as per design given including cost of steel reinforcement and GI binding wire, wastage etc complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 1,870 | Kg. | 88 ₹1,64,560 | 95 ₹1,77,650 | 82 ₹1,53,340 | 78.08 ₹1,46,009.6 | 78.09 ₹1,46,028.3 | 65 ₹1,21,550 Lowest | 90 ₹1,68,300 | 80 ₹1,49,600 |
| 8.00 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and half crushed stone sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 22 | m³ | 8,600 ₹1,89,200 | 9,300 ₹2,04,600 | 8,224 ₹1,80,928 | 7,674.97 ₹1,68,849.34 | 7,675.88 ₹1,68,869.36 | 6,568 ₹1,44,496 Lowest | 7,200 ₹1,58,400 | 8,500 ₹1,87,000 |
| 9.00 | Supplying and fixing of MS Grill of approved design for open courtyard, grill, grill work to doors, window, ventilators and openings etc using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc complete complying with standard specification. | 225 | Kg. | 130 ₹29,250 | 85 ₹19,125 Lowest | 96.3 ₹21,667.5 | 100.43 ₹22,596.75 | 100.44 ₹22,599 | 328 ₹73,800 | 180 ₹40,500 | 100 ₹22,500 |
Tender Value
₹14.5 L
EMD Value
₹14,500
Closing Date
13 Aug 2026, 3:00 pmClosed
Executive Officer,
Suchindrum Town Panchayat Office
Construction of drainage at 5th Ward Manavilai Mutharamman Thirumanamandapam to Vlukanparai Palani tea stall in Suchindrum Town Panchayat.
2026_DTP_689248_1
94/2026/A1
Open Tender
Civil Works
Works
90 days
Suchindrum Town Panchayat Office
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹14,500
2 Sept 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
13 Aug 2026
28 Jul 2026
28 Jul 2026 - 13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc complete. (Narrow Foundation - First Depth upto 2 metre) | 148 | m³ | - | - |
| 2 | Cement Concrete 1:4:8 (One cement, Four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Mechanical Means | 25.5 | m³ | - | - |
| 3 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 238 | m² | - | - |
| 4 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. - Mixing by mechanical means | 79 | m³ | - | - |
| 5 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 54 | m² | - | - |
| 6 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29 m height for plain surfaces such as RCC slabs rectangular beams Tee or L beams lintels, stair case beam etc. in all floors with all cross bracing using mild steel sheets of size 90x60 cm and BG10 gauge stiffended with welded mild steel angles of size 25x25x3 mm for boarding laid over silver oak country wood joists of size 10x6.5 cm spaced at about 90 cm center to center and supported with casurina props of 10 cm to 13 cm Ø spaced at 75 cm center to center etc. complete complying with standard specification in all floors. TNDSS No:30&36 | 75 | m² | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel/Ribbed T or Steel reinforcement grills of all variety like HYSD/CTD/TMT and all grade like Fe500, Fe550D, Fe500D etc for all RCC works as per design given including cost of steel reinforcement and GI binding wire, wastage etc complete complying with standard specification and as directed by the departmental officers. (Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) | 1,870 | Kg. | - | - |
| 8 | Reinforced Cement Concrete 1:1½:3 (One Cement, One and half crushed stone sand and three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including Super Plasticiser, mixing charges for machine mix,laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix | 22 | m³ | - | - |
| 9 | Supplying and fixing of MS Grill of approved design for open courtyard, grill, grill work to doors, window, ventilators and openings etc using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc complete complying with standard specification. | 225 | Kg. | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_828509.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_828509.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .