| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-Finance | L1 | Accepted-Finance Being a lowest bidder and reasonable | |
| 2 | L2₹37.7 L+₹6.8 L (21.9%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹37.8 L+₹6.9 L (22.4%)Rejected-Finance 165 UTTAR KASTODANGA ROAD KOLKATA 700 061 | KOLKATA | KOLKATA | WEST BENGAL | 700061 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹38.4 L+₹7.5 L (24.2%)Rejected-Finance 197 PATHAK PARA ROAD KOLKATA 700060 | KOLKATA | KOLKATA | WEST BENGAL | 700060 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹38.4 L+₹7.5 L (24.3%)Rejected-Finance 121004 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | JAGATMATA ENTERPRISE L4 | GHOSH ENTERPRISE L5 | Shanti Construction Company L6 | MS AP CONSTRUTION AND CO L3 | S.K. TRADERS L7 | Commercial Electric Co. L9 | DEYS ENTERPRISE L1 | JOY-EN-JOY L2 | UNIVERSAL TRADING CENTRE L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Trenches not exc. 1.50 Metre wide and not exc. 1.50 Metre in depth for laying of UG Cable/Pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 182.4 | Cum | 462 ₹84,268.8 | 455 ₹82,992 | 530 ₹96,672 | 470 ₹85,728 | 455 ₹82,992 | 325 ₹59,280 | 200 ₹36,480 Lowest | 480 ₹87,552 | 500 ₹91,200 |
| 2.00 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 5.94 | Cum | 603 ₹3,581.82 | 651 ₹3,866.94 | 600 ₹3,564 | 670 ₹3,979.8 | 655 ₹3,890.7 | 500 ₹2,970 Lowest | 500 ₹2,970 Lowest | 650 ₹3,861 | 500 ₹2,970 Lowest |
| 3.00 | Excavation/Cutting Road/ Hardstanding in Trenches not exc. 1.50 Metre wide and not exc. 1.50 Metre in depth and getting out, complete all as specified and as directed. NOTE : Quoted Unit Rate shall deem to be included Materials and Labour required for repairing to damaged Road/ Hardstanding to match the existing Surfaces and Specifications. | 50 | Cum | 390 ₹19,500 | 410 ₹20,500 | 500 ₹25,000 | 360 ₹18,000 | 460 ₹23,000 | 550 ₹27,500 | 200 ₹10,000 Lowest | 400 ₹20,000 | 400 ₹20,000 |
| 4.00 | Returning, filling in, including spreading watering and well ramming in layers not exc 25cm in layers, complete all as specified and directed. | 113.43 | Cum | 180 ₹20,417.4 | 210 ₹23,820.3 | 250 ₹28,357.5 | 190 ₹21,551.7 | 250 ₹28,357.5 | 225 ₹25,521.75 | 150 ₹17,014.5 Lowest | 200 ₹22,686 | 300 ₹34,029 |
| 5.00 | Removal of surplus spoil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point, complete all as specified and directed. | 68.97 | Cum | 395 ₹27,243.15 | 450 ₹31,036.5 | 530 ₹36,554.1 | 390 ₹26,898.3 | 450 ₹31,036.5 | 150 ₹10,345.5 Lowest | 150 ₹10,345.5 Lowest | 400 ₹27,588 | 400 ₹27,588 |
| 6.00 | Sand cushioning in trenches for cushioning of LT underground cable including spreading, levelling, well ramming in layers not exceeding 25cm in depth, complete all as specified and directed. | 54.72 | Cum | 2,300 ₹1,25,856 | 2,450 ₹1,34,064 | 2,100 ₹1,14,912 | 2,100 ₹1,14,912 | 2,000 ₹1,09,440 | 2,200 ₹1,20,384 | 900 ₹49,248 Lowest | 2,400 ₹1,31,328 | 2,400 ₹1,31,328 |
| 7.00 | Supply and fix sub class 'B' bricks of standard size for cable protection in trenches complete all as specified and directed. | 6.08 | Per 1000 Nos | 10,000 ₹60,800 | 10,100 ₹61,408 | 11,000 ₹66,880 | 11,000 ₹66,880 | 10,200 ₹62,016 | 10 ₹60.8 Lowest | 8,000 ₹48,640 | 10,000 ₹60,800 | 11,000 ₹66,880 |
| 8.00Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- | ||||||||||||
| 8.10 | 10 Sqmm to 16 Sqmm, 4 core | 430 | RM | 25 ₹10,750 | 35 ₹15,050 | 25 ₹10,750 | 29 ₹12,470 | 35 ₹15,050 | 40 ₹17,200 | 20 ₹8,600 Lowest | 30 ₹12,900 | 30 ₹12,900 |
| 8.20 | 25 Sqmm to 35 Sqmm, 3.5/4 Core | 330 | RM | 39 ₹12,870 | 45 ₹14,850 | 25 ₹8,250 | 36 ₹11,880 | 45 ₹14,850 | 50 ₹16,500 | 20 ₹6,600 Lowest | 40 ₹13,200 | 30 ₹9,900 |
Tender Value
₹34.5 L
EMD Value
₹69,000
Closing Date
27 Aug 2026, 6:00 pmClosed
GARRISON ENGINEER(FW) KOLKATA
D9, Commissariat Road, Hastings, Kol-22
REPAIR/ MAINT OF AREA LIGHTING/ BUILDING SECURITY LIGHT/ DECORATIVE LIGHT AND HIGH MAST LIGHT OUTSIDE VIJAY DURG UNDER GE(FW) KOLKATA
2026_MES_783129_1
8640/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GARRISON ENGINEER(FW) KOLKATA
AS PER NIT
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER(FW) KOLKATA
₹69,000
26 Sept 2026
6 Aug 2026
28 Aug 2026
6 Aug 2026
27 Aug 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Trenches not exc. 1.50 Metre wide and not exc. 1.50 Metre in depth for laying of UG Cable/Pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 182.4 | Cum | - | - |
| 2 | Excavation in Trenches exc. for each additional 1.5m or part thereof in depth beyond the first 1.5 m for laying of steel tubular pole/Stays, etc., getting out including forming bottom surface to required level and gradient in Soft/ Loose Soil and getting out, complete all as specified and as directed. | 5.94 | Cum | - | - |
| 3 | Excavation/Cutting Road/ Hardstanding in Trenches not exc. 1.50 Metre wide and not exc. 1.50 Metre in depth and getting out, complete all as specified and as directed. NOTE : Quoted Unit Rate shall deem to be included Materials and Labour required for repairing to damaged Road/ Hardstanding to match the existing Surfaces and Specifications. | 50 | Cum | - | - |
| 4 | Returning, filling in, including spreading watering and well ramming in layers not exc 25cm in layers, complete all as specified and directed. | 113.43 | Cum | - | - |
| 5 | Removal of surplus spoil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.5 metre above the starting point, complete all as specified and directed. | 68.97 | Cum | - | - |
| 6 | Sand cushioning in trenches for cushioning of LT underground cable including spreading, levelling, well ramming in layers not exceeding 25cm in depth, complete all as specified and directed. | 54.72 | Cum | - | - |
| 7 | Supply and fix sub class 'B' bricks of standard size for cable protection in trenches complete all as specified and directed. | 6.08 | Per 1000 Nos | - | - |
| 8Taking down unserviceable LT cable for repair/ replacement etc (from cable duct/underground trench / pole), stacking properly (cable, pipe and bricks) complete all as directed by the Engr-in-Charge of the following cross - sections :- | |||||
| 8.1 | 10 Sqmm to 16 Sqmm, 4 core | 430 | RM | - | - |
| 8.2 | 25 Sqmm to 35 Sqmm, 3.5/4 Core | 330 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_877417.xls
BOQ • 5.93 MB
TENDERDOCUMENTS8640_merged.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .