Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SITE OFFICE PTPS PANIPAT | PANIPAT | PANIPAT | HARYANA | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 327D 1 ZIRAKPUR GLOBAL BUSSINESS PARK CHANDIGARH AMBALA HIGHWAY 3RD FLOOR VILLAGE TOWN ZIRAKPUR CITY ZIRAKPUR SAS NAGAR PUNJAB 140603 INDIA | S A S NAGAR | PUNJAB | 140603 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹28,500
Closing Date
20 Mar 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN/BMD-I, RGTPP
XEN/BMD-I, RGTPP, Khedar, Hisar
Overhauling of ESP installed in Unit-I, RGTPP during forthcoming overhauling of 600 MW Unit-I, RGTPP, HPGCL, Khedar, Hisar
2023_HBC_265307_1
NIT No.242/RGTPP/BMD-I/302 Vol.-I Dated 14.03.2023
Open Tender
Power/Energy Projects/Products
Tender
27 days
RGTPP, Khedar
As per NIT details
3 documents required · 3 mandatory
₹1,180
₹28,500
Yes
3 Apr 2023
14 Mar 2023
21 Mar 2023
14 Mar 2023
20 Mar 2023
14 Mar 2023
Amount
Part-A (as per main scope of work) :
Lumsum Rate for Overhauling of ESP installed in Unit-I, RGTPP during forthcoming overhauling of 600 MW Unit-I, RGTPP, HPGCL, Khedar, Hisar.
Part-B (variable Scope of work) : (Unit rate wise items) :
Rectification of collecting electrode frame of ESP
Removal of badly damaged collecting electrodes of ESP
Straightening of collecting electrodes
Replacement of emitting electrodes
Replacement of inner arm
Replacement of outer arm with hammer
Replacement of plain/ fixed dust free bearing
Replacement of shaft of collecting rapping mechanism
Replacement of shaft of emitting rapping mechanism
Providing stiffener in the horizontal/ longitudinal beam of ESP structure
Replacement of shaft insulator of ESP
Replacement of support insulator of ESP
Fabrication and welding of U-clamp in ESP
Replacement of gas distribution screen
Man hour rate (including T&P, gas, consumables etc.) skilled welder/labour
Man hour rate (including T&P, gas, consumables etc.) semi-skilled welder/labour
Man hour rate (including T&P, gas, consumables etc.) un-skilled welder/labour
supermech infrastructure pvt ltd
K K POWER CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .