Tender Value
₹39.6 L
EMD Value
₹40,000
Closing Date
28 Apr 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development Officer (BP)
Panchayat Union, Thirumanur
Reconstruction of Houses 3 Nos and Renovation of Infrastructure works in Samathuvapuram at Varanavasi Panchayat of Thirumanur Block in Ariyalur District under Samathuvapuram Scheme 2021-22
2022_RDTN_229163_1
A2/0952/2021,Dated.12.04.2022
Open Tender
Civil Works - Buildings
Works
180 days
Panchayat Union, Thirumanur
As per Tender Document
4 documents required · 4 mandatory
₹0
₹40,000
Panchayat Union, Thirumanur
2 May 2022
13 Apr 2022
28 Apr 2022
13 Apr 2022
28 Apr 2022
13 Apr 2022
20 Apr 2022
90 days
Amount
1.Renovation of Housing at Samathuvapuram in Varanavasi Panchayat(House No.43,Beneficiary Name:Selvaraj S/O Karuppaiyan) Dismantling , Clearing away the existing damaged Pressed tile roof finish in cement mortar including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Dismantling Brick/Stone Masonry in Cement Mortar including all Labour Charges etc, complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Finishing the top of roof with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10 -12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats over Old/new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Cost and Supply Of Steel door Size 0.90X2.10M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of Steel Window Size 0.90X1.20M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of RCC Jolly of size 0.60X0.45m including cost and conveyance of all materials to site and all labour charges etc,complete
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accesseries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 17
Supply and Fixing of 11 W CFL in the existing light point SD 83
Suplying and Fixing of 1200mm (48") AC ceiling fan complete with stepped Regulator as per standard specifications. SD 110
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point . SD 36
Supply and fixing of 32 Amps DPIC Switch of 50 w with Metal Clad with fuse and neutral with (SD 158) Main
Supply and fixing of TNEB meter Board Suitable For 32 A Single Phase sc .With 32 A Fuse Unit etc.,SD 125
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main (SD 55)
2.Renovation of Housing at Samathuvapuram in Varanavasi Panchayat(House No.52,Beneficiary Name:jamalmogamad) Dismantling , Clearing away the existing damaged Pressed tile roof finish in cement mortar including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Dismantling Brick/Stone Masonry in Cement Mortar including all Labour Charges etc, complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Finishing the top of roof with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10 -12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats over Old/new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Cost and Supply Of Steel door Size 0.90X2.10M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of Steel Window Size 0.90X1.20M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of RCC Jolly of size 0.60X0.45m including cost and conveyance of all materials to site and all labour charges etc,complete
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accesseries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 17
Supply and Fixing of 11 W CFL in the existing light point SD 83
Suplying and Fixing of 1200mm (48") AC ceiling fan complete with stepped Regulator as per standard specifications. SD 110
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point . SD 36
Supply and fixing of 32 Amps DPIC Switch of 50 w with Metal Clad with fuse and neutral with (SD 158) Main
Supply and fixing of TNEB meter Board Suitable For 32 A Single Phase sc .With 32 A Fuse Unit etc.,SD 125
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main (SD 55)
3.Renovation of Housing at Samathuvapuram in Varanavasi Panchayat(House No.72,Beneficiary Name:Kaliyaperumal S/O Ponnan) Dismantling , Clearing away the existing damaged Pressed tile roof finish in cement mortar including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Dismantling Brick/Stone Masonry in Cement Mortar including all Labour Charges etc, complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Finishing the top of roof with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10 -12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats over Old/new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Cost and Supply Of Steel door Size 0.90X2.10M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of Steel Window Size 0.90X1.20M including cost and conveyance of all materials to site and all labour charges etc,complete
Cost and Supply Of RCC Jolly of size 0.60X0.45m including cost and conveyance of all materials to site and all labour charges etc,complete
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved quality
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accesseries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 17
Supply and Fixing of 11 W CFL in the existing light point SD 83
Suplying and Fixing of 1200mm (48") AC ceiling fan complete with stepped Regulator as per standard specifications. SD 110
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point . SD 36
Supply and fixing of 32 Amps DPIC Switch of 50 w with Metal Clad with fuse and neutral with (SD 158) Main
Supply and fixing of TNEB meter Board Suitable For 32 A Single Phase sc .With 32 A Fuse Unit etc.,SD 125
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main (SD 55)
4.Repairs of a Culvert -1 @ Near OHT in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
5.Repairs of a Culvert -2 @ Kambar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Provision for Name board
6.Repairs of a Culvert -3 @ Sekilar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
7.Repairs of a Culvert -4 @ Sekilar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Provision for Name board
8.Repairs of a Culvert -5 @ Sekilar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
9.Repairs of a Culvert -6 @ Ottakuthur Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
10.Repairs of a Culvert -7 @ Jayamkondar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Supplying and Filling with good river sand including cost and conveyance to the site and all labour charges etc., complete
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
11.Repairs of a Culvert -8 @ Thiruvalluvar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Provision for Name board
12.Repairs of a Culvert -9 @ Thiruvalluvar Street in Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Brick / stone masonry in cement mortar walls under 3m high including all Labour charges etc complete.
Dismantling RCC including all Labour Charges etc, complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Provision for Name board
13.Renewal of BT Road @ Samathuvapuram in 8 Streets in Varanavasi Panchayat (767 m) Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method)
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying tack coat over BT unprimed surface using 3.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc.,
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc.,
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.(using paver)
Provision for Name board
14.Plinth Prodection of Periyar statue at Samathuvapuram in Varanavasi Panchayat Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
15.Renovation of Arch at Samathuvapuram in Varanavasi Panchayat Chipping of Concrete and roughening the surface including all labour charges etc, complete.
Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete
Provision for Name board
16.Renovation of library Building at Samathuvapuram in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Pressed tile roof finish in cement mortar including all Labour charges etc complete.
Finishing the top of roof with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete ( 50%)
Chipping of concrete and roughening the surface including all Labour charges etc.complete.
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Clean Removal Cement Plaster including all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat , preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats over Old /new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Provision for Name board
17.Renovation of Two class room Building at Samathuvapuram PUE School in Varanavasi Panchayat Dismantling , Clearing away the existing damaged Pressed tile roof finish in cement mortar including all Labour charges etc complete.
Finishing the top of roof with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete ( 50%)
Chipping of concrete and roughening the surface including all Labour charges etc.complete.
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Clean Removal Cement Plaster including all labour charges etc
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Providing granolethic floor finish ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum
White washing two coats using shell lime including cost and conveyance of including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats with Emulsion Paint over the one coat of Priming coat , preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers.
Painting two coats over Old /new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shuruthi Engineering
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .