Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹5.8 CrAccepted-Finance | ₹5.8 Cr | H1 | Accepted-Finance As per technical Marks |
| 2 | H2₹7.0 Cr+₹1.3 Cr (22.3%)Accepted-Finance | ₹7.0 Cr+₹1.3 Cr (22.3%) | H2 | Accepted-Finance As per technical Marks |
| 3 | H3₹9.5 Cr+₹3.7 Cr (65.0%)Accepted-Finance UNIT NO 514 515 AND 516 5TH FLOOR SUNCITY SUCCESS TOWER GOLF COURSE EXTENSION ROAD GURGAON 122005 | GURGAON | GURGAON | HARYANA | 122005 | ₹9.5 Cr+₹3.7 Cr (65.0%) | H3 | Accepted-Finance As per technical Marks |
| 4 | H4₹11.5 Cr+₹5.7 Cr (99.5%)Accepted-Finance | ₹11.5 Cr+₹5.7 Cr (99.5%) | H4 | Accepted-Finance As per technical Marks |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically Non-Responsive |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
6 Mar 2024, 3:00 pmClosed
Surendra Yadav
HQ, NHIDCL New Delhi
Consultancy Services as AE for Supervision of Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0.00 to Ch. 53.04 Total Design Length 53.04 Km of Tato to Manigong
2024_NHIDC_791564_1
NHIDCL/Ar.Pr./ZS TZ/NH-913/AE/2024/232558
Open Tender
Civil Works
Item Rate
2738 days
HQ, NHIDCL
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Yes
GM NHIDCL
₹2 L
Yes
HQ, NHIDCL New Delhi
29 Nov 2024
22 Jan 2024
7 Mar 2024
22 Jan 2024
6 Mar 2024
29 Feb 2024
23 Jan 2024 - 14 Feb 2024
14 Feb 2024
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer 1 No.
Resident cum Highway Engineer 1 No.
Bridge/Structural Engineer 1 No.
Senior Pavement Specialist 1 No.
Senior Quality Cum Material Expert 2 No.
Road Safety Expert 1 No.
Sub-Professional Staff
Survey Engineer, 1 Nos.
Assistant Highway Engineer, 2 Nos.(2*30+1*60)
Environmental Engineer, 1 No.
Assistant Bridge Engineer, 1 Nos.
Assistant Quality cum Material Engineer, 2 Nos.
Quantity Surveyor, 1 No.
Electrical Engineer, 1 No.
Horticulture cum Landscaping Expert 1 Nos
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 6000km/month run
Scorpio or equivalent vehicle (not more than 3 years old) (1 nos .)
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 45 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 200 sqm area shall be rented at one location in midway of project during Construction Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle(53.04 kms)
Pavement strength measurement using FWD ((53.04 kms)
Bridge inspection using Mobile Bridge Inspection Unit (1.05 Km)
Road signs inspection using Retro Reflectometer (53.04 km)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Technocrats Advisory Services Pvt. Ltd. (BID ID -2980696)
MSV INTERNATIONAL INC (BID ID -2980414)
SA Infrastructure Consutants Pvt. Ltd. (BID ID -2980835)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .