Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.6 LAdmitted-Finance | -21.50% | ₹12.6 L | L1 | Admitted-Finance |
| 2 | L2₹12.6 L+₹8,000.17 (0.64%)Admitted-Finance E E NAGAR NIGAM GORAKHPUR | -21.00% | ₹12.6 L+₹8,000.17 (0.64%) | L2 | Admitted-Finance |
| 3 | L3₹12.8 L+₹24,160.52 (1.92%)Admitted-Finance | -19.99% | ₹12.8 L+₹24,160.52 (1.92%) | L3 | Admitted-Finance |
| 4 | L4₹13.4 L+₹79,841.71 (6.36%)Admitted-Finance | -16.51% | ₹13.4 L+₹79,841.71 (6.36%) | L4 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
19 Aug 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Purushottam nagar ward me shusila devi ke makan hote hue shila yadev ke makan tak cc sadak va nali nirman karya as per Nit 21
2026_DOLBU_1174607_21
507/NNA/CMNSY/2026
Open Tender
Civil Works
Percentage
45 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,250
MC
₹1.6 L
19 Sept 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
19 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/w in excavation in ordinary soil etc all complete. S.I. No. 251 | 96 | Cum | 125 | ₹12,000 |
| 2 | P/LP.C.C. work in 1:5:10 with cement. 2 F/sand and 40mm brick ballast etc all complete. Work SI No 274 | 9.6 | Cum | 4,125 | ₹39,600 |
| 3 | Class 150 brick work in 1:4 Csand all complete. SI No 305b | 53.16 | Cum | 5,390 | ₹2,86,532.4 |
| 4 | P/L of C.C. in 1:2:4 with cement, c/sand 4 and stone grit etc all complete. Sl. No 2796 | 10.79 | Cum | 7,850 | ₹84,701.5 |
| 5 | 12 mm thick plaster in 1:3 with cement and c/sand etc all complete. | 216 | Sqm | 190 | ₹41,040 |
| 6 | E/w in fitting with cartage up to 5 Km Etc all complete. S.I No 253 | 199.5 | Cum | 278 | ₹55,461 |
| 7 | Supply & Laying of GSB etc all complete work | 68.4 | Cum | 3,866.86 | ₹2,64,493.22 |
| 8 | S/L of 125 micron Polythene sheet etc all complete | 456 | Sqm | 25 | ₹11,400 |
| 9 | Providing and laying CC pavement of mix M-20 with ready mixed concrete from batching plam. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating brooming with wire brush etc complete as per specifications and directions of Engineer-incharge | 68.4 | Cum | 9,070 | ₹6,20,388 |
| 10 | P/mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect NON METALLIC CC HARDNER (@5kg HARDNER per sqm of surface area SAME AS IN dsr. 26.31.1 | 456 | Sqm | 96.25 | ₹43,890 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_2207609.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .