| 1 | Admitted-Finance 20 TIRUPPUR CORPORATION 1ST ZONE GANDHI ROAD ANUPPARPALAYAM TIRUPPUR 641652 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 641652 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
14 Nov 2020, 3:00 pmClosed
The Superintending Engineer/ Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd Floor, 208 650 K.R.B.S TOWER PERUMANALLUR ROAD, TIRUPUR 641 602, TAMILNADU
Tender for HT and LT line Extension and Improvement works in Avinashi Division Under K2 Agreement Works Contract
2020_EB_183929_1
Spec.No.W.33/2020-21 Dt.29.10.2020
Open Tender
Electrical Works
Works
365 days
Avinashi Division
2 documents required · 2 mandatory
₹0
₹25,000
Yes
27 Nov 2020
31 Oct 2020
16 Nov 2020
31 Oct 2020
14 Nov 2020
31 Oct 2020
31 Oct 2020 - 14 Nov 2020
Transporting of RCC / RSJ / PSC / fabricated pole from road side to pole pit head - upto 1 km
Transporting of RCC / RSJ / PSC / fabricated pole from road side to pole pit head - above 1 km
Transporting of distribution transformer / metering set by using private vehicle other than bullock cart with load of one MT minimum / vice versa - upto 30 km
Transporting of distribution transformer / metering set by using private vehicle other than bullock cart with load of one MT minimum / vice vers - above 30 km
Transporting of line materials from sub-stores to section pocket or near the work spot at road side using private vehicle other than bullock cart with load of one MT minimum / vice versa - upto 8 km
Transporting of line materials from sub-stores to section pocket or near the work spot at Road side using private vehicle other than bullock cart with load of one MT minimum / vice versa - above 8 km
Loading of PSC / RCC poles upto 8.0 m
Loading of metal poles of all sizes
Loading of PSC / RCC poles 9 m & above
Unloading of PSC / RCC poles upto 8.0 m
Unloading of metal poles of all sizes
Unloading of PSC / RCC poles 9 m & above
Loading of distribution transformer upto 100 KVA
Loading of distribution transformer above 100 KVA and below 500 KVA
Loading of distribution transformer 500 KVA
Loading of Metering set
Unoading of distribution transformer upto 100 KVA
Unloading of distribution transformer above 100 KVA and below 500 KVA
Unloading of distribution transformer 500 KVA
Unloading of metering set
Excavation & back filling of pole pit for poles below 9 m per location by men / machine
Excavation & back filling of pole pit for poles 9 m and above per location by men / machine
Excavation & back filling of pole pit per location - hard rock requires blasting
Excavation & back filling of pole pit per location - hard rock without blasting
Erection of poles by men / machine - RCC / PSC / metal poles upto 8.0 m
Erection of poles by men / machine - RCC / PSC / metal poles 9 m
Erection of poles by men / machine - RSJ, PSC, rail, fabricated poles above 9 m
Mass concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole
Sleeve concreting of pole including cost of cement, sand & jally with a mixture of 1:3:6, including all materials per pole
Earthing of pole with wire including burying loop and binding
Earthing of pole with earthing coil including burying loop and binding
Excavation & back filling of stay pit for poles below 9 m per location by men / machine
Excavation & back filling of stay pit for poles 9 m and above per location by men / machine
Excavation & back filling of stay pit per location - hard rock requires blasting
Excavation & back filling of stay pit per location - hard rock without blasting
Erection of stay set complete
Fixing of 11 KV pin insulator (porcelain with pin / polymer composite)
Fixing of 11 KV disc
Fixing of 22 KV pin insulator (porcelain with pin / polymer composite)
Fixing of 22 KV disc
Fixing of 33 KV pin insulator (porcelain with pin / polymer composite)
Fixing of 33 KV disc
Erection of 5 feet V cross arm
Erection of 1372 mm (4.5 feet) V cross arm
Erection of 1068 mm (3.5 feet) V cross arm
Erection of LT 3 phase cross arm
Erection of LT single phase cross arm
Erection of HT / LT TI fitting
Erection of double channel cross arm
Erection of guarding cross arm
Erection of tapping channel cross arm
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of knob
Fixing of HT LAS (3 Nos.)
Fixing of LT LAS (3 Nos.)
Paving of conductor, stringing, binding, jumpering complete with ACSR / AAAC for HT / LT line per KM -7/2.50 or 7/2.59 (Weasel)
Paving of conductor, stringing, binding, jumpering complete with ACSR / AAAC for HT / LT line per KM - 7/3.15 or 7/3.35 (Rabbit)
Paving of conductor, stringing, binding, jumpering complete with ACSR / AAAC for HT / LT line per KM - 7/4.09 (Raccoon)
Paving of conductor, stringing binding jumpering complete with ACSR / AAAC for HT/LT line per KM- 6/4.72 + 7/1.57 (Dog)
Guarding arrangements per span - split neutral guarding
Guarding arrangements per span - flat guarding with 4 wire (11 KV or 22 KV)
Assembling of top channel for double pole DT structure
Assembling of bed channel for double pole DT structure
Assembling of cross with stud for bed channel for double pole DT structure
Assembling of belting angle and HG fuse angle for double pole DT structure
Erection of AB switch, horizontal, double pole
Erection of HG fuse set complete for double pole DT structure
Structure earthing complete (3 Nos. earth pits and 3 Nos. earth pipes complete) for double pole DT structure
Feeding arrangements with open type fuse unit for double pole DT structure
HT & LT LAS fixing and jumpering complete for double pole DT structure
Fixing of support insulator angle and erection of 3 Nos. pin insulators for double pole DT structure
HT jumpering complete for double pole DT structure
Painting of all clamps and other iron materials and painting of structure pole for double pole DT structure
Provision of LT bus arrangements for double pole DT structure
Erection of single pole structure including transportation, excavation and erection in pole pit 3 X 3 X 6 feet by men or machine
Assembling & erection of single pole mounted GOS switch
Assembling & erection of single pole HG fuse set, solid core type
Erection of HT LAS for single pole DT structure
Erection of LT LAS for single pole DT structure
HT jumpering work for single pole DT structure
Feeding arrangements with open type fuse unit for single pole DT structure
Earthing for single pole DT structure
Sleeve concreting for single pole DT structure
Special structure painting for single pole DT structure
Erection of stay set for single pole DT structure
Erection of special DT centre support set with concreting for single pole DT structure
DT metering (whole current meter) arrangements (including fixing of DT meter box) for single pole / double pole DT structure
DT metering (LTCT meter) arrangements (including fixing of DT meter box) for single pole / double pole DT structure
Fixing of MODEM including accessories for single pole / double pole DT structure
Erection of transformer in new structure - below 200 KVA
Erection of transformer in new structure - 200 KVA & above but below 500 KVA
Erection of transformer in new structure - 500 KVA
Dismantling of poles by men / machine - RCC / PSC / metal poles upto 8.0 m
Dismantling of poles by men / machine - RCC / PSC / metal poles 9 m
Dismantling of poles by men / machine - RSJ, PSC, rail, fabricated poles above 9 m
Dismantling of stay set complete
Dismantling of 11 KV pin insulator (porcelain with pin / polymer composite)
Dismantling of 11 KV disc
Dismantling of 22 KV pin insulator (porcelain with pin / polymer composite)
Dismantling of 22 KV disc
Dismantling of 33 KV pin insulator (porcelain with pin / polymer composite)
Dismantling of 33 KV disc
Dismantling of 5 feet V cross arm
Dismantling of 1372 mm (4.5 feet) V cross arm
Dismantling of 1068 mm (3.5 feet) V cross arm
Dismantling of LT 3 phase cross arm
Dismantling of LT single phase cross arm
Dismantling of HT / LT TI fitting
Dismantling of double channel cross arm
Dismantling of guarding cross arm
Dismantling of tapping channel cross arm
Dismantling of LT pin Insulator
Dismantling of LT shackle
Dismantling of knob
Dismantling of HT LAS (3 Nos.)
Dismantling of LT LAS (3 Nos.)
Dismantling of conductor 7/2.50 or 7/2.59 (Weasel)
Dismantling of conductor 7/3.15 or 7/3.35 (Rabbit)
Dismantling of conductor 7/4.09 (Raccoon)
Dismantling of conductor 6/4.72 + 7/1.57 (Dog)
Dismantling of split neutral guarding
Dismantling of flat guarding with 4 wire (11 KV or 22 KV)
Dismantling of top channel from double pole DT structure
Dismantling of bed channel from double pole DT structure
Dismantling of cross with stud for bed channel from double pole DT structure
Dismantling of belting angle and HG fuse angle from double pole DT structure
Dismantling of AB switch, horizontal, double pole
Dismantling of HG fuse set complete from double pole DT structure
Dismantling of feeding arrangements with open type fuse unit from double pole DT structure
Dismantling of HT & LT LAS from double pole DT structure
Dismantling of support insulator angle and 3 Nos. pin insulators from double pole DT structure
Dismantling of single pole structure
Dismantling of single pole mounted GOS switch
Dismantling of single pole HG fuse set, solid core type
Dismantling of HT LAS from single pole DT structure
Dismantling of LT LAS from single pole DT structure
Dismantling of stay set from single pole DT structure
Dismantling of special DT centre support set from single pole DT structure
Dismantling of earthing complete from DT structure (single pole / double pole)
Dismantling of DT metering (Whole Current Meter) arrangements (including dismantling of DT Meter Box)
Dismantling of DT metering (LTCT Meter) arrangements (including dismantling of DT Meter Box)
Dismantling of modem including accessories
Dismantling of transformer from structure - below 200 KVA
Dismantling of transformer from structure - 200 KVA & above but below 500 KVA
Dismantling of transformer from structure - 500 KVA
Manufacturing and supply of special type clamps for rail poles, RS joists, tubular poles, distribution transformer strucutres with material
Drilling of hole 3/4 or 1 inch in channel, angles, etc. per hole
Cutting of flat per cutting
Cutting of channel per cutting
Cutting of angle per cutting
Cutting of pipe per cutting
Alteration of back clamp to suit works
Alteration of stay clamp to suit works
Fixing of new street light fittings
Fixing of new Sodium / Mercury lamp fittings
Street light switch box erection complete with pipe provision
Dismantling of new street light fittings
Dismantling of new Sodium / Mercury lamp fittings
Dismantling of street light switch box with pipe
Erection of metering set 11 KV / 22 KV / 33 KV
Dismantling of metering set 11 KV / 22 KV / 33 KV
TI fitting welding with clamps
Cutting of RS joist pole
Welding in RS joist pole
New service connection wires dismantling and re-errection for Single Phase Service
New service connection wires dismantling and re-errection for Three Phase Service
Releasing of Single Phase Meter and refixing (for works not covered under HQ schemes)
Releasing of Three Phase Meter and refixing (for works not covered under HQ schemes)
Destruction of pole concreting at site
Retrieving grill from deteriorated RCC pole
Painting (2 coats) of Distribution Transformer below 100 KVA
Painting (2 coats) of Distribution Transformer 100 KVA & above upto 250 KVA
Painting (2 coats) of Distribution Transformer above 250 KVA
Painting of RSJ tubular pole includng cross arm, TI fittings - single coating
Painting of pole at ground
Numbering of pole with black back ground and yellow letters including cost of paint per pole
Painting of transformer structure poles with two coats for each structure
Painting of service connection details in Meter Board / Agricultural services / Hut service door including cost of Paint and Brush
Replacement of earthpipe per loc
Re-earthing of structure completely
Cleaning of DT yard
Cleaning of RMU
Cleaning of ring fencing
Setting right the leaning pole in HT/LT at pin point location
Setting right the leaning pole in HT/LT at cut point location
Resagging of lines for all sizes at cutpoint location per wire / span
Clearing of branches of trees
Providing LT spacers - single phase line
Providing LT spacers - three phase line
Erection of LT Shunt Capacitor including transport
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .