| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 LAccepted-AOC | ₹31.7 L | L1 | Accepted-AOC Less Rate |
| 2 | L2₹32.5 LRejected-AOC | ₹32.5 L | L2 | Rejected-AOC High Rate |
| Sl No | Description | Qty | Unit | PUGALMATHI AND CO L1 | SR Enterprises L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF 60000 LITRES CAPACITY OHT @ SARANDAPALLI H/O SARANDAPALLI | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 67.64 | Cum | 260 ₹17,586.40 | 266.5 ₹18,026.06 |
| 3.00 | B)Second depth of 1m | 11.77 | Cum | 260 ₹3,060.20 | 266.5 ₹3,136.71 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 3.36 | Cum | 1,767 ₹5,937.12 | 1,811.17 ₹6,085.55 |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 5.05 | Cum | 5,380 ₹27,169 | 5,514.5 ₹27,848.23 |
| 6.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 7.00 | For items 1.5m to 4.5m below GL | 7.43 | Cum | 9,246 ₹68,697.78 | 9,477.15 ₹70,415.22 |
| 8.00 | For items 0 to 1.50m below GL | 2.53 | Cum | 9,107.34 ₹23,041.57 | 9,335.02 ₹23,617.61 |
| 9.00 | For items 0m to 1m above GL | 0.49 | Cum | 9,248 ₹4,531.52 | 9,479.2 ₹4,644.81 |
| 10.00 | For items 1m to 4.50m above GL | 3.51 | Cum | 9,248 ₹32,460.48 | 9,479.2 ₹33,271.99 |
Tender Value
₹32.1 L
EMD Value
₹33,000
Closing Date
27 Jan 2026, 3:00 pmClosed
Block Development officer,Thally
Block Development office,Thally
Krishnagiri District Thally Union NABARD RIDF XXIX 2025_2026 CONSTRUCTION OF 60000 LITRES CAPACITY OHT SARANDAPALLI H_O SARANDAPALLI TLY66
2026_RDTN_646208_1
ROC_4455_2025_A2_27_11_2025
Open Tender
Civil Works - Others
180 days
Block Development office, Thally
Refer tender doc
3 documents required · 3 mandatory
₹0
₹33,000
Block Development office,Thally
9 Apr 2026
23 Jan 2026
27 Jan 2026
23 Jan 2026
27 Jan 2026
23 Jan 2026
24 Jan 2026
CONSTRUCTION OF 60000 LITRES CAPACITY OHT @ SARANDAPALLI H/O SARANDAPALLI
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
B)Second depth of 1m
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
For items 1.5m to 4.5m below GL
For items 0 to 1.50m below GL
For items 0m to 1m above GL
For items 1m to 4.50m above GL
For items 4.50m to 7.32m above GL
For items 7.32m to 10.98m above GL
For items 10.98m to 14.64m above GL
For items above 14.64m & up to 18.30m from GL
I) Plane Surface
Below GL
From GL to 3.30m
From 3.31GL to 4.30m
Ground level to 3.30 m
Square column 3.31 to 4.30m
Square column 4.31 to 5.30m
Cuver surfsce 0-3.30
Cuver surfsce 3.30-4.30
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Providing outside M.S Ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps fixed at 30 cm centre to centre etc.and providing of Landing slabs with hand rails using 32mm GI pipe and 40mmx6mm MS flat etc. as per approved design
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (One cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc.
Providing GI Ventilation arrangement 2 nos mosquito proof nylon net with 65 mm GI pipe and spls as directed by the Departmental officers 1 m 65 mm Gi pipe, 4 nos 65 mm Gi elbow , 4nos cutting and 8 nos threading and 2 nos 65 mm GI tee
Providing cut stone slab in CM 1:3 of size 0.3 m x 0.3 m x 0.15 m and as directed by Departmental officers
Supplying and fixing in position CI manhole covers with CI frames (Heavy duty) of size 60cm x 60cm of best approved quality as per standard specification etc., complete compying with standard specifications
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixed with 12mm dia Fastner Bolt 75mm long and as directed by Departmental officers
Supply and delivery of 32mm GI Pipes (Medium) for Hand Rails over roof cover slab
Vertical pipes at 0.45m spacing ( 3.142 * 5.34m / 0.45m = 38 nos)
Harizontal pipes over Vertical pipes ( 3.142 * 5.34m = 16.77m)
Supply and delivery of MS Base plate 40 x 6 mm thick for Hand Rails at 0.45 m height ( Horizantal ) Weight 1.99 kg / m = 3.14 *5.34 m = 16.77 m
Supply and delivery of MS Base plate of 100 x 100 x 6 mm thick over cover slab for fixing of 32 mm GI Pipes (Medium) Pipes vertical (approximately 0.750 grams for each)
Supply and fixing of Anchoor fastner bolt 12 mm dia of 75 mm long in the base plates
32 mm dia GI Ppes cutting charges
32 mm dia GI Ppes Welding charges
MS Plates cutting charges
MS Flates Welding charges
MS Flats ( 40 X 6 mm ) 80 + 12 = 92 mm
32 mm dia GI Ppes Horizantal ( 3.142 * 16.77 m * 0.034 m = 1.79 sqm) and 32 mm dia GI Ppes Vertical = 38 nos x 0.90 m x0.034 m - 1.16sqm ( 1.79 + 1.16 =2.95 )
Provision for pipe connection arrangements for inlet, outlet scour and overflow etc. including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint
65mm dia GI pipes
75mm dia PVC Threaded coupler
65mm dia GI Tee
65mm dia GI Elbow
65mm dia GM Gate valve
65mm dia GI Flangeset
65mm dia GI Coupling
65mm GI Dummy
63 mm PVC 4Ksc Pipe
63 mm PVC Bend
75mm X 90mm PVC Reducer
90mm Pvc Threaded coupler
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers
Provision for Soak pit as per sub estimate
Earthwork excavation and depositing on bank with initital lead of 10 m and lift of 2.00 m iin Hard stiff clay, stiff black cotton soil Hard red earth shales, murrams and earth mixed with small size in various classification of soil cofirm to SS.20B refilling of excaveted the earth etc. complete.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work in Cement mortar 1:5 mix using country brick of size 22 x 11 x 7 cm including cost and conveyance and all labour charges etc.,
Supply and filling of 40 mm HBG metal (Jelly ) including cost and conveyance and all labour charges etc., complete
Supply and filling of Sand as per specification including cost and conveyance and all labour charges etc., complete
Plastering with CM 1:5 mix to 12 mm thick including cost and conveyance and all labour charges etc.,
Provision for distribution pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers.
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe including laying and jointing,
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
63mm 4KSCPVC Pipe laying & jointing
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mmPVC Ball Valve
Provision sub Estimate for Pumping Pipe line
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers.
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
75mm 6KSCPVC Pipe including laying and jointing,
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
75mm 6KSCPVC Pipe laying & jointing
75mm PVC Elbow
75mm PVC Tee
75mm PVC End Cap
75 mmPVC Ball Valve
Fencing Alround the OHT
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15CM thick. Compacting ete., complete complying with standard specification.
Supply and Erection of Centering for sides and soffits including all labour charge
Supplying, fabricating and placing in position Mild steel/ Ribbed Tor steel grills for all Rcc works as per design given including cost of steel and G.I binding wire in all floors etc., complete complying with standard specification.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply and Fixing of CHAIN LINK 2'X2' USING GAUGE Galvanised Iron wire (of all sizes) all cost and conveyance etc., all complete M0408
Provision for Grill Gate with lock and Key arrangements including all cost and all labour charges
Chlorinator
Provsion for Photo charges
Provsion for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_774605.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
PB66.pdf
Tender Documents • 0.57 MB
TB66.pdf
Tender Documents • 0.54 MB
BOQ_774605.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid