Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | ₹4.6 L | L1 | Accepted-AOC ok |
| 2 | L2₹5.5 L+₹85,377.16 (18.4%)Rejected-Finance | ₹5.5 L+₹85,377.16 (18.4%) | L2 | Rejected-Finance L2 |
Tender Value
₹7.0 L
EMD Value
₹6,953
Closing Date
19 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER RANPUR
OFFICE OF THE EXECUTIVE OFFICER RANPUR
CONSTRUCTION OF PAVER ROAD FROM PURUNABASANTA SANAGARH CC ROAD TOWARDS CREMATORIUM IN WN-03
2026_ORULB_127994_13
RNP NAC -01/2026-27
Open Tender
Civil Works - Others
Percentage
30 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,953
Yes
28 Aug 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
19 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation in hard soil including rough dressing and levelling the bed by depositing soil within initial lead and lift . | - | Cum | 1 | - |
| 2 | Supplying and filling Sand in foundation and on Road Surface including watering and ramming with Cost, Conveyance and Royalty of all materials etc. allcomplete . | 1.66 | Cum | 668.2 | ₹1,109.21 |
| 3 | Cement Concrete in (1:3:6:) using 40 MM size hard granite metal (C.B.) with watering and Curing including cost, conveyance and royalty of all materials etc. complete | 31.56 | Cum | 6,233.91 | ₹1,96,742.2 |
| 4 | Cement Concrete in (1:2:4:) using 12MM size hard granite chips (C.B.) with watering and Curing including cost, conveyance and royalty of all materials etc. complete | 16.84 | Cum | 7,050.15 | ₹1,18,724.53 |
| 5 | Rigid and Smooth centering and shuttering for cement concrete work and dismantling them after casting including cost & conveyance of all materials etc. complete. | 99.66 | Sqm | 233.9 | ₹23,310.47 |
| 6 | Providing & filling on road surface wih stone screened dust passing through 2.36 mm sieve and retained on 0.075 mm sieve in uniform layers not exceeding 225 mm thick with watering and compacting with VRR to achive the required density in OMC including cost, conveyance, royality of all materials etc.all complete as per direction of Er-in-Charge. | 33.77 | Cum | 1,481.7 | ₹50,035.53 |
| 7 | Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for road including cost, conveyance and royality of all materials etc.all complete as per direction of Er-in-Charge. | 31.56 | Cum | 2,095.35 | ₹66,129.25 |
| 8 | Providing and laying 80 mm thick Factorymade cement contrete interlocking Paver block of M 40 grade made by block making machine with stong vibratory compaction and approved size and design / shape laid in required colour and pattem over and including 40 mm thick compacted bed of coarse sand,filing the joints with coarse sand etc all complete as per the direction of Enginner-in-charge. | 313.31 | Sqm | 752.26 | ₹2,35,690.58 |
| 9 | Providing a Display signboard at site made of Brick/Stone Masonry with writing details about the Project as per direction of Engineer-in-Charge | 1 | LS | 1,211 | ₹1,211 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_587568.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .