Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Finance | -59.62% | ₹4.0 L | L1 | Admitted-Finance |
Tender Value
₹10.9 L
EMD Value
₹21,808
Closing Date
27 Apr 2026, 3:00 pmClosed
SRM RIICO Rajsamand
RIICO Unit Office Rajsamand
Jungle Cleaning Of Upcoming Auction plots, Greenbelt, Open Areas, Parks, Rotary and Roadside at I/A Baggad, Rajsamand
2026_RIICO_550473_1
2026/Rajsamand/11953/120/NIT15
Open Tender
Civil Works
90 days
I/A Baggad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
RIICO Rajsamand
₹21,808
Yes
30 Apr 2026
7 Apr 2026
28 Apr 2026
7 Apr 2026
27 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Mechanical Means, In area of thorny jungle | - | Hectare | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Clearing and Grubbing Road Land, Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201., By Manual Means, In area of non-thorny jungle | - | Hectare | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | By Mix in Place Method, For Grading III Material | - | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | - | Sqm | - | - | BI01010001010000000000000515BI0100001117 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_981182.xls
BOQ • 0.34 MB
TD.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid