Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance | ₹6.0 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹6.1 L+₹14,964.94 (2.50%)Rejected-Finance | ₹6.1 L+₹14,964.94 (2.50%) | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹6.2 L+₹22,447.41 (3.75%)Rejected-Finance | ₹6.2 L+₹22,447.41 (3.75%) | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹7.5 L
EMD Value
₹74,825
Closing Date
14 Sept 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer office, KNN, Motijheel
Barricating and dewatering work on artificial ponds for Ganesh and Durga idol immersion under ward-42 zone-4.
2026_NNKAN_1183992_1
198/AA-4/26-27
Open Tender
Civil Works
Percentage
45 days
ward-42 parmat
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹74,825
16 Sept 2026
9 Sept 2026
14 Sept 2026
9 Sept 2026
14 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,315 | Sqm | 7 | ₹9,205 |
| 2 | Barricating with ropes, ballies and bamboos etc all complete. Barricating with ropes, ballies and bamboos etc all complete | 840 | Rmt | 50 | ₹42,000 |
| 3 | E/W in Excavation in trenches for foundation pipe cable etc in ordinary soil (loan clay or sand ) including 1.5 left and 50m and dressing Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), excavated soil and disposal of surplus excavated soil as directed, within a lead of SO m.lncluding dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the All kinds of soil. | 847.5 | Cum | 215 | ₹1,82,212.5 |
| 4 | S/F of polythene paper plastic cover in excavated portion etc. all complete. (size 55x3 sqm) S/F of polythene paper plastic cover in excavated portion etc. all complete. (size 55x3 sqm) | 20 | Nos | 4,900 | ₹98,000 |
| 5 | Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. Dewatering of nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. | 364 | Hours | 228 | ₹82,992 |
| 6 | Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal Dismentalllng of B.O.E soling/Inter locking tiles Including Stacking of servicable direction of EI/C (Labour only)material and disposal of unservicable material within a lead of 50m | 76.47 | Sqm | 11 | ₹841.17 |
| 7 | construction of granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp | 7.2 | Cum | 3,676 | ₹26,467.2 |
| 8 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid In required line, Laying old cement cocrete interlocking paver blocks of any design/ shape laid In required line, level, curvature, colour and pattern over and including 50 mmthick compacted bed of coarse sand, filling the joints with fine sand etc:. all Sq complete as per the direction of Engineer-In-charge. (Old CC paver blocks shallbe supplied by the department free of cost). | 76.47 | Sqm | 255 | ₹19,499.85 |
| 9 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge Note - item to be applicable in urban areas having directions for restricted hours for movement/plying of load carrying motor vehicle of 3.5 cum or more." "Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-chargeNote - item to be applicable in urban areas having directions for restricted hours for movement/plying of load carrying motor vehicle of 3.5 cum or more. | 678 | cum | 255 | ₹1,72,890 |
| 10 | Add 18 % G.S.T. | 1 | Tax | 1,14,139.39 | ₹1,14,139.39 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2227001.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2227001.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .