Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.7 LAccepted-AOC C O AMBU HOTEL NEAR GOVT POLYTECHNIC DOLLY GUNJ PORT BLAIR 744 103 | PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | ₹47.7 L Quoted ₹48.0 L | L1 | Accepted-AOC Lowest |
| 2 | L2₹50.7 L+₹2.7 L (5.60%)Rejected-Finance 101 GROUND FLOOR RAJASTHALI ENCLAVE DUMARDAGA RANCHI JHARKHAND 834012 | RANCHI | JHARKHAND | 834012 | ₹50.7 L+₹2.7 L (5.60%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹54.1 L+₹6.1 L (12.7%)Rejected-Finance | ₹54.1 L+₹6.1 L (12.7%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹55.7 L+₹7.7 L (16.1%)Rejected-Finance SHOP NO 6 BENGALI CLUB MIDDLE POINT SRI VIJAYA PURAM 744101 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹55.7 L+₹7.7 L (16.1%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹57.0 L+₹9.1 L (18.9%)Rejected-Finance 290 NEW PLOT JAWAHAR NAGAR JAMMU JAMMU JAMMU KASHMIR 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | ₹57.0 L+₹9.1 L (18.9%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | RPG AND COMPANY L7 | Island Ship Repairers L6 | M/S SHRI SHYAM BUILDERS L2 | Allied Trading Company L5 | Nirman Construction Company L3 | Bharat Udyog L4 | M/s K Moorthi L8 | City Constructie Pvt Ltd L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply install testing and commissioning Silent type Diesel Engine Generator set 160 KVA (CPCB-IV), Prime Duty, 415V, Radiator Cooled, with acoustic enclosure, diesel generating set powered with suitable capacity prime duty Engine along with base frame, 160 KVA, H/H at 40degC, 50Hz, 415V, 1500RPM Alternator (capable of delivering true 128 kW output @ 0.8 power factor), Static Excitation System, Lube Oil System, Electronic Governor including DG AMF Controller with AMF Panel which will be start the adjustable mains failure sensing delay of 0–30 seconds when main supply cut off and automatic shut down when main supply will be on DIEF SGC420 with breaker (MCCB / ACB), AVM pads, 24V DC maintenance-free VRLA batteries of OEM recommended capacity , residential grade silencer with bellows, , with all other associated equipment / work complete in all respect. all respect as per the latest notification MOEFCC NOTIFICATION “GSR 804(E) DATED 03.11 .2022 [F.NO. Q-15017/05/2012-CPW suitable for ambient condition at Port Blair and confirming to condition under IS 4722, 10001/10002, 13364, BS 5514/2613/5000 with following :- | 1 | Each Job | 31,50,000 ₹31,50,000 | 32,50,000 ₹32,50,000 | 28,00,000 ₹28,00,000 | 30,00,000 ₹30,00,000 | 27,00,000 ₹27,00,000 | 29,00,000 ₹29,00,000 | 31,00,000 ₹31,00,000 | 24,50,000 ₹24,50,000 Lowest |
| 1.01(A) Alternator :- Standard design alternator rated at 160 KVA net output at site after considering derating as per site conditions at 0.8 (lag) power factor AC, 3 - phase 4 - wire 415 volts 50 Hz, 1500 RPM, self exicited self regulated screen protected drip proof IP 23 enclosure brushless design with winding in pole faces, insulating class 'H' and voltage regulation of + 1% at rated voltage from no load to full load. The alternator shall be confirming to BS 2613/5000, IS: 13364 and shall be in position to generate supply with frequecy regulation with in ±1% tolerace. The alternator will be suitable for tropical climate and shall generally confirm to BS - 2613/5000/ IS - 4722. i) Insulation class - 'H' ii) Temperature rise Class - 'H' iii) Excitation : Self Excited iv) Regulation performance: The voltage is kept constant with ±1%, manual voltage adjustment within + 5%. v) Frequency regulation ±1% | |||||||||||
| 1.02(B) Diesel Engine: - Diesel engine of adequate OEM rated capacity capable of continuously driving the specified alternator after applying site derating factors. based on manufacturers technical details water cooled to drive independently above alternator and after considering derating as per site conditons after generating and reducing power consumed by accessories directly coupled through flexiable coupling multi cylinder multi stroke direct injection, cold starting 1500 RPM, as per relevant ISI/BS -10001/10002/ 5514 with an overload capacity of 10% for half an hour in 12 hours continuous running complete with standard accessories all as specified and required for safe handling and operation salient features of accessories shall be as under:- (i) Fly wheel with housing (ii) Cooling System :- Moulded radiator with fan and belts (iii) Exhaust System :- Exhaust System complete with exhaust piping upto & outside and 1meter away from the enclosure,wrapped with ceramic fibre / mineral wool insulation and aluminium cladding. complete with in the enclosure for safe exhaust without transforming vibration to the wall of the enclosure. Exhaust Manifold Silencer :- Residual type Bellows | |||||||||||
| 1.03(iv) Fuel System :- Fuel injection system with fuel injectors, fuel injection solenoid switch controlled by governer electronic operated/ (as recommended by OEM) for 1% speed /frequecy regulation. Fuel Filters, Fuel hoses (v) Lub Oil System:- Lubricating oil filter Lubricating oil pump (vi) Air Intake system Air Intake Manifold Air cleaner dry type (vii) Governer electronic (as recommended by OEM) (viii) Starting System :- Electric self starter with and including battery charging alternator. ix) Batteries :- Batteries of maintenance free of capacity as recommended by the manufacturer complete with copper conductor multistranded leads of suitable length from self starter to the battery terminal complete with initial charge and initial fill of electrolyte all as specified and directed. Starter User ring Start and Stop push button Ignition key/switch | |||||||||||
| 1.04Handling and operation : salient features of accessories shall be as under Radiator with blower fan Corrosion inhabitor coolant Paper element filters for fuel lubricating oil and bypass Fly wheel housing and fly wheel (x)Generator Monitoring Panel :- Comprising of all standard items as mentioned under this schedule or as per standard practice ignition key switch and start/stop arrangement, indications for Engine parametes, hour run meter RPM meter Engine oil pressure indicator water/coolent temparature indicator, Battery volt display. (xi) Safety Controls : - Engine low lube oil pressure high water temparature and over speeding of engine. (xii) Coupling arrangement : - Flexible coupling, fly wheel to suit flexible coupling. (xiii) Accessories :- AVM Pads built or separately mounted to manufactrer's base frames as per (as recommended by OEM) (xiv) Base Frame : - Made out of ISMC of sturdy design made of MS channel with necessary reinforcement and predetermined holes. (xv) Fuel Tank :- Daily service fuel tank (as recommended by OEM) with caliberated level indicating arrangement, stop cock, drain plug, complete on a common base in side the accoustic enclosure. (xvi) OEM factory routine test certificates shall be submitted before dispatch. | |||||||||||
| 1.05(C) Acoustic Enclosure:- Manufactured by OEM suitable for 160 KVA DG Set. (i) NAL approved as per CPCB. (ii) It Should be as per latest rules and regulations of Ministry of Environment and Forest and Pollution control board. (iii) The generating set batteries and control panel should be inside the enclosure. (iv) Fuel tank should be in side the enclosure. (v) Construction Details/specification are as follows : - (a) Outer body :- CRCA Sheet of 1.6mm thick. (b) Doors :- CRCA sheet of 1.6 mm thick. (c) Sound Insulation :- 100 mm thick rock wool (64kg/Cum). (vi) The accoustic should be composite in construction and fully assembled integral unit. (vii) The batteries should be placed inside the enclosure beside the DG Set on a suitable inlsulated platform. (viii) The DG Set should be provided with external Emergency stop push button. (ix) The enclosure should be suitably illuminated by LED luminaire fittings. (x) The noise level should be Noise level shall conform to latest CPCB norms for DG sets ,under free field conditions. (xi) The accoustic enclosure parts shall be of powder coated after pre treatment process. The powder coating shade should be Genset Green. The base frame should be painted with epoxy based black shade. | |||||||||||
| 1.06Notes :- (i) The capacity of Generator set shall be net after all due derating factors as per relevant ISI design. (ii) The quoted rate shall be deemed to be inclusive of first fill of oil and FOL for final successful acceptance test. (iii) The contractor shall arrange for artificial load for testing for final testing of DG Set at site and the cost is deemed to be including in above offer. (iv) All civil works including PCC platform and foundations work required for equipments including making good during installation and commissioning of Gen Set. The depth of the foundation and PCC shall be provided as per manufacturer's instructions complete all as per specified and directed. (v) Pre-commissioning test by IEM or any testing officer as nominated by HQ CE (A&N) Zone through Accepting Officer after installation of DG Set. The quoted rate shall be deemed to be inclusive of 12 hours test run at site including of half an hour on 10% overhead in presence of testing officer, all arrangements shall be made by the contractor for tests (vi) The Contractor shall submit GA drawings of DG Set for approval of Accepting Officer before placing order. | |||||||||||
| 2.00 | M&L for Earthing complete with galvanised earth plate electrode 60 cm x 60cmx 6.00 mm thick, buried directly in ground vertically (earth pit not less than 2.25 m deep below ground level) with top edge of the earth plate not less than 1.5m below ground level , connected to GI earth srip 32X6 as earthling lead by means bolts and nuts check nuts and washers of galvanized iron and connected to main switch board including watering arrangement with PCC chamber , MS funnel with wire mesh,. CI cover with frame etc including necessary excavation in any type of strata , returning, filling removal of soil outside MD land ,filling of charcoal and salt complete all as shown in electrical plate No. 3 of MES Sch Part I , connected to Earthing test point all as specified and directed on testing on completion including taking out old earthing.
NOTES: 1) The unit rate shall also include for earth work in any type of soil, PCC (1:3:6) type C1 chamber, pre-cast RCC (1:2:4) type B-1 using 20mm graded stone aggregate cover 50mm thick reinforced with TMT bars 8mm dia @ 100mm c/c both ways, funnel with watering pipe 20mm dia medium grade, GI protection pipe light grade 40 mm dia and wire mesh complete in addition to item No. 1(a) to (e) of preamble (notes) under sub-heading earthing, specified on Sl. Page Nos. 422 & 423 of SSR Part-II.
2) Earthing lead and GI protection pipe beyond 7.5m will be measured and paid separately. | 6 | Each set | 13,000 ₹78,000 | 11,000 ₹66,000 | 8,000 ₹48,000 Lowest | 11,500 ₹69,000 | 12,600 ₹75,600 | 10,500 ₹63,000 | 13,000 ₹78,000 | 12,000 ₹72,000 |
| 3.00 | Supply, laying, testing and commissioning of LT XLPE insulated, sheathed, armoured heavy duty electric aluminium conductor cable 1100 Volts grade of size 3.5 core x 95 sq.mm. (laid in trenches, ducts, pole, wall etc.) complete all as specified and as as specified and as directed.
Note: Rate of under ground cable excludes earth Work, sand cushioning, brick or PCC covering, light Grade GI tubing where necessary,testing etc. | 80 | RM | 1,250 ₹1,00,000 | 1,250 ₹1,00,000 | 1,000 ₹80,000 Lowest | 1,500 ₹1,20,000 | 1,300 ₹1,04,000 | 1,350 ₹1,08,000 | 1,300 ₹1,04,000 | 1,200 ₹96,000 |
| 4.00 | Supply, laying, testing and commissioning of LT XLPE insulated, sheathed, armoured heavy duty electric aluminium conductor cable 1100 Volts grade of size 3.5 core x 185 sq.mm. (laid in trenches, ducts, pole, wall etc.) complete all as specified and as specified and as directed.
Note: Rate of under ground cable excludes earth Work, sand cushioning, brick or PCC covering, light Grade GI tubing where necessary,testing etc. | 80 | RM | 2,400 ₹1,92,000 | 1,700 ₹1,36,000 | 1,480 ₹1,18,400 Lowest | 1,900 ₹1,52,000 | 1,800 ₹1,44,000 | 2,000 ₹1,60,000 | 1,650 ₹1,32,000 | 2,100 ₹1,68,000 |
Tender Value
₹49.7 L
EMD Value
₹99,400
Closing Date
20 Jul 2026, 6:00 pmClosed
GE Haddo Sri Vijaya Puram
GARRISON ENGINEER HADDO MILITARY ENGINEER SERVICES HADDO SRI VIJAYA PURAM 744102
PROVISION OF DEDICATED DG SETS FOR UNINTERRUPTED SUPPLY TO INDIAN NAVY ONLINE EXAM CENTRE INOES AT INS JARAWA AND SPECIAL REPAIR TO EXTERNAL ELECTRIC SYSTEM AT NAU PBR UNDER GE HADDO SRI VIJAYA PURAM
2026_MES_775167_1
8284/E8
Open Tender
Civil Works
Item Rate
180 days
GE Haddo Sri Vijaya Puram
As per NIT
9 documents required · 9 mandatory
₹500
GE Haddo
₹99,400
Yes
21 Sept 2026
29 Jun 2026
22 Jul 2026
29 Jun 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply install testing and commissioning Silent type Diesel Engine Generator set 160 KVA (CPCB-IV), Prime Duty, 415V, Radiator Cooled, with acoustic enclosure, diesel generating set powered with suitable capacity prime duty Engine along with base frame, 160 KVA, H/H at 40degC, 50Hz, 415V, 1500RPM Alternator (capable of delivering true 128 kW output @ 0.8 power factor), Static Excitation System, Lube Oil System, Electronic Governor including DG AMF Controller with AMF Panel which will be start the adjustable mains failure sensing delay of 0–30 seconds when main supply cut off and automatic shut down when main supply will be on DIEF SGC420 with breaker (MCCB / ACB), AVM pads, 24V DC maintenance-free VRLA batteries of OEM recommended capacity , residential grade silencer with bellows, , with all other associated equipment / work complete in all respect. all respect as per the latest notification MOEFCC NOTIFICATION “GSR 804(E) DATED 03.11 .2022 [F.NO. Q-15017/05/2012-CPW suitable for ambient condition at Port Blair and confirming to condition under IS 4722, 10001/10002, 13364, BS 5514/2613/5000 with following :- | 1 | Each Job | - | - |
| 1.01 | (A) Alternator :- Standard design alternator rated at 160 KVA net output at site after considering derating as per site conditions at 0.8 (lag) power factor AC, 3 - phase 4 - wire 415 volts 50 Hz, 1500 RPM, self exicited self regulated screen protected drip proof IP 23 enclosure brushless design with winding in pole faces, insulating class 'H' and voltage regulation of + 1% at rated voltage from no load to full load. The alternator shall be confirming to BS 2613/5000, IS: 13364 and shall be in position to generate supply with frequecy regulation with in ±1% tolerace. The alternator will be suitable for tropical climate and shall generally confirm to BS - 2613/5000/ IS - 4722.
i) Insulation class - 'H'
ii) Temperature rise Class - 'H'
iii) Excitation : Self Excited
iv) Regulation performance: The voltage is kept constant with ±1%, manual voltage adjustment within + 5%.
v) Frequency regulation ±1% | - | - | - | - |
| 1.02 | (B) Diesel Engine: - Diesel engine of adequate OEM rated capacity capable of continuously driving the specified alternator after applying site derating factors. based on manufacturers technical details water cooled to drive independently above alternator and after considering derating as per site conditons after generating and reducing power consumed by accessories directly coupled through flexiable coupling multi cylinder multi stroke direct injection, cold starting 1500 RPM, as per relevant ISI/BS -10001/10002/ 5514 with an overload capacity of 10% for half an hour in 12 hours continuous running complete with standard accessories all as specified and required for safe handling and operation salient features of accessories shall be as under:-
(i) Fly wheel with housing
(ii) Cooling System :- Moulded radiator with fan and belts
(iii) Exhaust System :- Exhaust System complete with exhaust piping upto & outside and 1meter away from the enclosure,wrapped with ceramic fibre / mineral wool insulation and aluminium cladding. complete with in the enclosure for safe exhaust without transforming vibration to the wall of the enclosure.
Exhaust
Manifold Silencer :- Residual type
Bellows | - | - | - | - |
| 1.03 | (iv) Fuel System :- Fuel injection system with fuel injectors, fuel injection solenoid switch controlled by governer electronic operated/ (as recommended by OEM) for 1% speed /frequecy regulation.
Fuel Filters, Fuel hoses
(v) Lub Oil System:-
Lubricating oil filter
Lubricating oil pump
(vi) Air Intake system
Air Intake Manifold
Air cleaner dry type
(vii) Governer electronic (as recommended by OEM)
(viii) Starting System :- Electric self starter with and including battery charging alternator.
ix) Batteries :- Batteries of maintenance free of capacity as recommended by the manufacturer complete with copper conductor multistranded leads of suitable length from self starter to the battery terminal complete with initial charge and initial fill of electrolyte all as specified and directed.
Starter User ring
Start and Stop push button
Ignition key/switch | - | - | - | - |
| 1.04 | Handling and operation : salient features of accessories shall be as under
Radiator with blower fan
Corrosion inhabitor coolant
Paper element filters for fuel lubricating oil and bypass
Fly wheel housing and fly wheel
(x)Generator Monitoring Panel :- Comprising of all standard items as mentioned under this schedule or as per standard practice ignition key switch and start/stop arrangement, indications for Engine parametes, hour run meter RPM meter Engine oil pressure indicator water/coolent temparature indicator, Battery volt display.
(xi) Safety Controls : - Engine low lube oil pressure high water temparature and over speeding of engine.
(xii) Coupling arrangement : - Flexible coupling, fly wheel to suit flexible coupling.
(xiii) Accessories :- AVM Pads built or separately mounted to manufactrer's base frames as per (as recommended by OEM)
(xiv) Base Frame : - Made out of ISMC of sturdy design made of MS channel with necessary reinforcement and predetermined holes.
(xv) Fuel Tank :- Daily service fuel tank (as recommended by OEM) with caliberated level indicating arrangement, stop cock, drain plug, complete on a common base in side the accoustic enclosure.
(xvi) OEM factory routine test certificates shall be submitted before dispatch. | - | - | - | - |
| 1.05 | (C) Acoustic Enclosure:- Manufactured by OEM suitable for 160 KVA DG Set.
(i) NAL approved as per CPCB.
(ii) It Should be as per latest rules and regulations of Ministry of Environment and Forest and Pollution control board.
(iii) The generating set batteries and control panel should be inside the enclosure.
(iv) Fuel tank should be in side the enclosure.
(v) Construction Details/specification are as follows : -
(a) Outer body :- CRCA Sheet of 1.6mm thick.
(b) Doors :- CRCA sheet of 1.6 mm thick.
(c) Sound Insulation :- 100 mm thick rock wool (64kg/Cum).
(vi) The accoustic should be composite in construction and fully assembled integral unit.
(vii) The batteries should be placed inside the enclosure beside the DG Set on a suitable inlsulated platform.
(viii) The DG Set should be provided with external Emergency stop push button.
(ix) The enclosure should be suitably illuminated by LED luminaire fittings.
(x) The noise level should be Noise level shall conform to latest CPCB norms for DG sets ,under free field conditions.
(xi) The accoustic enclosure parts shall be of powder coated after pre treatment process. The powder coating shade should be Genset Green. The base frame should be painted with epoxy based black shade. | - | - | - | - |
| 2 | M&L for Earthing complete with galvanised earth plate electrode 60 cm x 60cmx 6.00 mm thick, buried directly in ground vertically (earth pit not less than 2.25 m deep below ground level) with top edge of the earth plate not less than 1.5m below ground level , connected to GI earth srip 32X6 as earthling lead by means bolts and nuts check nuts and washers of galvanized iron and connected to main switch board including watering arrangement with PCC chamber , MS funnel with wire mesh,. CI cover with frame etc including necessary excavation in any type of strata , returning, filling removal of soil outside MD land ,filling of charcoal and salt complete all as shown in electrical plate No. 3 of MES Sch Part I , connected to Earthing test point all as specified and directed on testing on completion including taking out old earthing.
NOTES: 1) The unit rate shall also include for earth work in any type of soil, PCC (1:3:6) type C1 chamber, pre-cast RCC (1:2:4) type B-1 using 20mm graded stone aggregate cover 50mm thick reinforced with TMT bars 8mm dia @ 100mm c/c both ways, funnel with watering pipe 20mm dia medium grade, GI protection pipe light grade 40 mm dia and wire mesh complete in addition to item No. 1(a) to (e) of preamble (notes) under sub-heading earthing, specified on Sl. Page Nos. 422 & 423 of SSR Part-II.
2) Earthing lead and GI protection pipe beyond 7.5m will be measured and paid separately. | 6 | Each set | - | - |
| 3 | Supply, laying, testing and commissioning of LT XLPE insulated, sheathed, armoured heavy duty electric aluminium conductor cable 1100 Volts grade of size 3.5 core x 95 sq.mm. (laid in trenches, ducts, pole, wall etc.) complete all as specified and as as specified and as directed.
Note: Rate of under ground cable excludes earth Work, sand cushioning, brick or PCC covering, light Grade GI tubing where necessary,testing etc. | 80 | RM | - | - |
| 4 | Supply, laying, testing and commissioning of LT XLPE insulated, sheathed, armoured heavy duty electric aluminium conductor cable 1100 Volts grade of size 3.5 core x 185 sq.mm. (laid in trenches, ducts, pole, wall etc.) complete all as specified and as specified and as directed.
Note: Rate of under ground cable excludes earth Work, sand cushioning, brick or PCC covering, light Grade GI tubing where necessary,testing etc. | 80 | RM | - | - |
| 5 | Supply, laying, testing and commissioning of LT XLPE insulated, sheathed, armoured heavy duty electric aluminium conductor cable 1100 Volts grade of size 3.5 core x 240 sq.mm. (laid in trenches, ducts, pole, wall etc.) complete all as specified and as as specified and as directed.
Note: Rate of under ground cable excludes earth Work, sand cushioning, brick or PCC covering, light Grade GI tubing where necessary,testing etc. | 200 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
8284TENDER.pdf
Tender Documents • 1.30 MB
BOQ_868026.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .