Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹188.6 CrAccepted-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹188.6 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹195.4 CrRejected-Finance | ₹195.4 Cr | L2 | Rejected-Finance 2ND LOWEST BID |
| 3 | L3₹201.7 CrRejected-Finance C 4 DISTRICT CENTRE SAKET NEW DELHI 110017 | SOUTH | DELHI | 110017 | ₹201.7 Cr | L3 | Rejected-Finance 3RD LOWEST BID |
| Sl No | Description | Qty | Unit | Ircon International Limited L3 | Rahee Infratech Limited L2 | Larsen & Toubro Limited L1 |
|---|---|---|---|---|---|---|
| 1.00Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of BallastlessTrackwork in Mainline from Bhakti Park [Ch. -550.0m] to Mulund Fire Station (Excluding station)(Excluding station) [Ch. 18929.611 m] including Siding Tracks at POB of Bhakti Park Station and Pocket Track between Sonapur&Mulund Fire Station (Excluding station)of Metro Line - 4 Corridor [Wadala – Kasarvadavali] of Mumbai Metro Rail Project of MMRDA, Mumbai. | ||||||
| 1.01 | Schedule ‘A’ | 1 | Lumpsum | 1,36,95,00,000 ₹24.7 Cr | 1,32,19,33,564 ₹23.8 Cr | 1,25,10,00,000 ₹22.5 Cr |
| 1.02 | Schedule ‘B’ | 1 | Lumpsum | 64,17,20,000 ₹11.6 Cr | 62,63,86,181 ₹11.3 Cr | 62,89,00,000 ₹11.3 Cr |
| 1.03 | Schedule ‘C’ | 1 | Lumpsum | 60,00,000 ₹10.8 L | 60,00,000 ₹10.8 L | 60,00,000 ₹10.8 L |
Tender Value
₹223.8 Cr
EMD Value
₹1 L
Closing Date
1 Oct 2024, 3:00 pmClosed
DIRECTOR WORKS
7TH FLOOR NEW MMRDA BUILDING BKC
BALLASTLESS TRACKWORK IN MAINLINE FROM POB AT BHAKTI PARK to MULUND FIRE STATION INCLUDING SIDING TRACKS AT POB OF BHAKTI PARK STATION AND POCKET TRACK BETWEEN SONAPUR AND MULUND FIRE STATION OF LINE 4
2024_MMRDA_1074391_1
MMRDA/4/MMRP/CA-168
Open Tender
Civil Works
730 days
MUMBAI
Please refer Tender documents.
9 documents required · 9 mandatory
₹11,800
₹1 L
MMRDA BKC
21 Aug 2025
23 Aug 2024
3 Oct 2024
23 Aug 2024
1 Oct 2024
6 Sept 2024
28 Aug 2024
Amount
Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of BallastlessTrackwork in Mainline from Bhakti Park [Ch. -550.0m] to Mulund Fire Station (Excluding station)(Excluding station) [Ch. 18929.611 m] including Siding Tracks at POB of Bhakti Park Station and Pocket Track between Sonapur&Mulund Fire Station (Excluding station)of Metro Line - 4 Corridor [Wadala – Kasarvadavali] of Mumbai Metro Rail Project of MMRDA, Mumbai.
Schedule ‘A’
Schedule ‘B’
Schedule ‘C’
Rahee Infratech Limited
Ircon International Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid