Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹188.6 CrAccepted-AOC 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹195.4 Cr+₹6.8 Cr (3.63%)Rejected-Finance 107 LAKHINARAYAN TALLA ROAD SHAMPUR HOWRAH 711103 | HOWRAH | HOWRAH | WEST BENGAL | 711103 | L2 | Rejected-Finance 2ND LOWEST BID | |
| 3 | L3₹201.7 Cr+₹13.1 Cr (6.96%)Rejected-Finance C 4 DISTRICT CENTRE SAKET NEW DELHI 110017 | NEW DELHI | NEW DELHI | DELHI | 110017 | L3 | Rejected-Finance 3RD LOWEST BID |
| Sl No | Description | Qty | Unit | Ircon International Limited L3 | Rahee Infratech Limited L2 | Larsen & Toubro Limited L1 |
|---|---|---|---|---|---|---|
| 1.00Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of BallastlessTrackwork in Mainline from Bhakti Park [Ch. -550.0m] to Mulund Fire Station (Excluding station)(Excluding station) [Ch. 18929.611 m] including Siding Tracks at POB of Bhakti Park Station and Pocket Track between Sonapur&Mulund Fire Station (Excluding station)of Metro Line - 4 Corridor [Wadala – Kasarvadavali] of Mumbai Metro Rail Project of MMRDA, Mumbai. | ||||||
| 1.01 | Schedule ‘A’ | 1 | Lumpsum | 1,36,95,00,000 ₹24,65,10,000 | 1,32,19,33,564 ₹23,79,48,041.52 | 1,25,10,00,000 ₹22,51,80,000 Lowest |
| 1.02 | Schedule ‘B’ | 1 | Lumpsum | 64,17,20,000 ₹11,55,09,600 | 62,63,86,181 ₹11,27,49,512.58 Lowest | 62,89,00,000 ₹11,32,02,000 |
| 1.03 | Schedule ‘C’ | 1 | Lumpsum | 60,00,000 ₹10,80,000 Lowest | 60,00,000 ₹10,80,000 Lowest | 60,00,000 ₹10,80,000 Lowest |
Tender Value
₹223.8 Cr
EMD Value
₹1 L
Closing Date
1 Oct 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DIRECTOR WORKS
7TH FLOOR NEW MMRDA BUILDING BKC
BALLASTLESS TRACKWORK IN MAINLINE FROM POB AT BHAKTI PARK to MULUND FIRE STATION INCLUDING SIDING TRACKS AT POB OF BHAKTI PARK STATION AND POCKET TRACK BETWEEN SONAPUR AND MULUND FIRE STATION OF LINE 4
2024_MMRDA_1074391_1
MMRDA/4/MMRP/CA-168
Open Tender
Civil Works
Lump-sum
730 days
MUMBAI
Please refer Tender documents.
9 documents required · 9 mandatory
₹11,800
₹1 L
MMRDA BKC
21 Aug 2025
23 Aug 2024
3 Oct 2024
23 Aug 2024
1 Oct 2024
6 Sept 2024
28 Aug 2024
Amount
Design, Construction, Manufacturing, Supply, Installation, Testing and Commissioning of BallastlessTrackwork in Mainline from Bhakti Park [Ch. -550.0m] to Mulund Fire Station (Excluding station)(Excluding station) [Ch. 18929.611 m] including Siding Tracks at POB of Bhakti Park Station and Pocket Track between Sonapur&Mulund Fire Station (Excluding station)of Metro Line - 4 Corridor [Wadala – Kasarvadavali] of Mumbai Metro Rail Project of MMRDA, Mumbai.
Schedule ‘A’
Schedule ‘B’
Schedule ‘C’
Rahee Infratech Limited
Ircon International Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
150847711.pdf
Tender Documents • 0.10 MB
150847712.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .