| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.6 LAdmitted-Finance | -5.60% | ₹32.6 L | L1 | Admitted-Finance |
| 2 | L2₹33.9 L+₹1.2 L (3.81%)Admitted-Finance | -2.00% | ₹33.9 L+₹1.2 L (3.81%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹34.6 L
EMD Value
₹69,140
Closing Date
1 Jun 2026, 3:00 pmClosed
EE PHED DIV DD2
EE PHED DIV DD2
NIT 13.1 Work of Repair /Maintenance of various size of tube well, pipe line, PH and monoblock of village mundiya ramsar, Bhambhori and Pachar section - I Jhotwara under Sub divn Jhotwara (Rural), District Jaipur
2026_PHCJA_561492_1
NIT 13/26-27 EE PHED DD2 JPR
Open Tender
Civil Works - Water Works
Percentage
365 days
EE PHED DIV DD2
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EE PHED DIV DD2/MD RISL
₹69,140
Yes
16 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of pipe lines irrespective of size & material which includes repairing of bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, collection & recording minimum 10 Nos. residual chlorine samples during supply timings, interconnections and all works related to pipe line network in existing distribution / rising main pipe lines of all sizes by digging out suitable size of pit in soft and lose soil / hard soil including cutting of black top, WBM & CC top of road of any size at work site. this will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and upto ground level. For entire job contractor will be use their own T&P. Contractor with his own resources shall arrange de-watering if any and restore any aenity at his cost demaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipe line net work within scope of work for per km pipe line per month.
Minimum labour for a following kms pipelines to be deployed | - | - | - | - |
| 2 | 101 km to 200 km - Two fitter-II & Four beldar
(118 km x 12 Months = 1417 km) | - | Per KM Per Month | 787 | - |
| 3 | Maintenance of tubewells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month. | - | - | - | - |
| 4 | 6.0 HP to 7.5 HP(6Nos @12=72) | - | Each | 72 | - |
| 5 | 8.0 HP to 10.0 HP(8 Nos@12=96) | - | Each | 96 | - |
| 6 | Daily/ periodical operation of valves at supply times for
specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor) | - | - | - | - |
| 7 | 80-300mm (19 Nos@12=228) | - | Each | 1,200 | - |
| 8 | Running expenditure of pumphouses which
includes complete operation of pumpmotor , maintenance of log-books as by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (excluding repairing of pumping machinery etc.) | - | - | - | - |
| 9 | Upto 100 HP (3Nos @12 Month=36 Months) | - | Each | 36,600 | - |
| 10 | Maintenance of centrifugal pump sets and motor including cost of rewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect .for per Centrifugal pump set with pannel per month. maintenance of histroy sheet as directed by Engineer-in-charge for centrifugal pump set per month.
Operated load of Centrifugal Pump sets (HP) | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
1TD13OandSection1.pdf
Tender Documents • 5.28 MB
BOQ_999311.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .