| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.8 LAdmitted-Fee/PreQual/Technical/Finance AT LAITARA PO BORIA PS KESINGA DIST KALAHANDI | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹31.4 L+₹62,814.55 (2.04%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹36.8 L+₹5.9 L (19.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹43.2 L+₹12.4 L (40.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹43.3 L+₹12.5 L (40.5%)Admitted-Fee/PreQual/Technical/Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹43.4 L
EMD Value
₹43,500
Closing Date
21 Sept 2026, 5:00 pmClosed
Superintending Engineer
RURAL WORKS DIVISION, KESINGA
Construction of dispensary building and boundary wall of GHD Sarian Dist- Kalahandi
2026_CERWI_140026_1
RWKSNG-online-3/26-27
Open Tender
Civil Works - Buildings
Percentage
270 days
Kalahandi
2 documents required · 2 mandatory
₹6,000
₹43,500
Yes
24 Sept 2026
3 Sept 2026
22 Sept 2026
3 Sept 2026
21 Sept 2026
3 Sept 2026
3 Sept 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed of the foundation including cost of all labour required for the work etc. complete with all other machineries required for the work and stacking the excavated materials away from the working area as directed by the Engineer-in-Charge including 1% Cess. | 180 | cum | 282.88 | ₹50,918.4 |
| 2 | Supplying and filling foundation and plinth with sand well watered & rammed with cost, conveyance, royalty and taxes of all materials labour required for the work as per specification and direction of the Engineer-in-Charge including royalty of materials including 1% Cess. | 112.43 | cum | 523.94 | ₹58,906.57 |
| 3 | Providing Cement Concrete (1:3:6) in foundation with 4cm nominal size of hand broken hard granite metal of approved quality from approved quarry including hoisting, lowering, and laying in postition in layers not exceeding 150mm. thick with proper packing and ramming to proper slope and level including watering, curing with cost, conveyance, royality, taxes, labour, T&P and all other materials required for the work, finishing the exposed surface smooth, providing grooves and beads where ever necessary etc. complete in all respect as per the specification and including 1% cess as per direction of the Engineer-in-Charge | 33.19 | cum | 5,981.28 | ₹1,98,518.68 |
| 4 | Fly ash brick masonary in cement mortar (1:6) in foundation and plinth after immersing brick for six hours in water before use with good quality fly ash brick of 10"sizes having crushing strength not less than 75Kg./Sqm including splays cutting ,circular moulding and similar such type of work with necessary projections, chamfering and corbelling, watering and curing etc. complete including cost, conveyance , royalties of all materials with cost of all labours,all taxes with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge. | 59.93 | cum | 5,530.12 | ₹3,31,420.09 |
| 5 | Fly ash brick masonary in cement mortar (1:6) in Superstructure after immersing brick for six hours in water before use with good quality fly ash brick of 10"sizes having crushing strength not less than 75Kg./Sqm including splays cutting ,circular moulding and similar such type of work with necessary projections, chamfering and corbelling, watering and curing etc. complete including cost, conveyance , royalties of all materials with cost of all labours,all taxes with T&P articles required for the work etc. complete as per specification and direction of the Engineer-in-charge Ground floor | 90.12 | cum | 5,563.45 | ₹5,01,378.11 |
| 6 | First floor | 12.99 | cum | 5,949.44 | ₹77,283.23 |
| 7 | R.C.C. work of M-25 grade with 20mm and down grade black hard granite (crusher broken) of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering, and curing for four weeks finishing the exposed surface and ceiling smooth, providing grooves or beads where necessary including cost, conveyance royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods or tor steel and binding wires and tying the grills and placing in proper position in all floors.as per the specification and direction of the EIC. Coloum base | 14.61 | cum | 6,647.4 | ₹97,118.51 |
| 8 | Coloum Ground floor | 5.51 | cum | 16,026.81 | ₹88,307.72 |
| 9 | Coloum 1st floor | 0.63 | cum | 17,366.33 | ₹10,940.79 |
| 10 | Grade beam | 5.5 | cum | 7,521.32 | ₹41,367.26 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 4.33 MB
BOQ_607962.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .