| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 CrRejected-Finance 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹3.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹4.0 CrRejected-Finance | ₹4.0 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹4.1 CrRejected-Finance | ₹4.1 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹4.1 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹4.1 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Mithilesh Kumar L1 | M/S BADRI SINGH L5 | BHAMAR SINGH L6 | VINAY KUMAR SINGH L4 | M/S PRABHAT TRADERS L3 | shivansh venture pvt ltd L7 | NIKHIL CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismentaling of stone masonry in CM with proper disposal of dismentaled material with all lead & lift including labour , material, T&P etc. as per direction of engineer in - charge. | 190.63 | M3 | 337 ₹64,242.31 | 250 ₹47,657.5 | 400 ₹76,252 | 400 ₹76,252 | 200 ₹38,126 | 414 ₹78,920.82 | 300 ₹57,189 |
| 2.00 | Dismentaling of RCC work its proper disposal & stacking of dismentaled material with lead & lift including labour , material, T&P etc. as per direction of engineer in - charge. | 18.22 | M3 | 675 ₹12,298.5 | 450 ₹8,199 | 800 ₹14,576 | 700 ₹12,754 | 500 ₹9,110 | 828 ₹15,086.16 | 650 ₹11,843 |
| 3.00 | Dismentaling of CC work its proper disposal of dismentaled material with lead & lift including all type of labour , material, T&P etc. as per direction of engineer in - charge. | 3.54 | M3 | 375 ₹1,327.5 | 250 ₹885 | 200 ₹708 | 490 ₹1,734.6 | 100 ₹354 | 460 ₹1,628.4 | 400 ₹1,416 |
| 4.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 7,186.04 | M3 | 84 ₹6,03,627.36 | 80 ₹5,74,883.2 | 75 ₹5,38,953 | 90 ₹6,46,743.6 | 50 ₹3,59,302 | 90.72 ₹6,51,917.55 | 72 ₹5,17,394.88 |
| 5.00 | Preparation of Sub-grade for Lining excluding cost of earth work. | 19,032 | M2 | 13 ₹2,47,416 | 17 ₹3,23,544 | 10 ₹1,90,320 | 15 ₹2,85,480 | 5 ₹95,160 | 13.77 ₹2,62,070.64 | 12.5 ₹2,37,900 |
| 6.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 2,484.76 | M3 | 3,810 ₹94,66,935.6 | 4,500 ₹1,11,81,420 | 4,560 ₹1,13,30,505.6 | 4,300 ₹1,06,84,468 | 4,300 ₹1,06,84,468 | 4,576.35 ₹1,13,71,131.43 | 4,500 ₹1,11,81,420 |
| 7.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 4,390.72 | M3 | 4,236 ₹1,85,99,089.92 | 4,800 ₹2,10,75,456 | 5,445 ₹2,39,07,470.4 | 4,600 ₹2,01,97,312 | 5,000 ₹2,19,53,600 | 5,196.16 ₹2,28,14,883.64 | 4,800 ₹2,10,75,456 |
| 8.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 22,734.87 | M2 | 111 ₹25,23,570.57 | 120 ₹27,28,184.4 | 125 ₹28,41,858.75 | 124 ₹28,19,123.88 | 110 ₹25,00,835.7 | 136.89 ₹31,12,176.35 | 52 ₹11,82,213.24 |
| 9.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 125.28 | M3 | 4,769 ₹5,97,460.32 | 6,000 ₹7,51,680 | 5,870 ₹7,35,393.6 | 6,200 ₹7,76,736 | 6,000 ₹7,51,680 | 5,531.63 ₹6,93,002.61 | 5,200 ₹6,51,456 |
| 10.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 201.84 | M2 | 104 ₹20,991.36 | 120 ₹24,220.8 | 110 ₹22,202.4 | 130 ₹26,239.2 | 100 ₹20,184 | 127.42 ₹25,718.45 | 110 ₹22,202.4 |
Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
20 Feb 2026, 3:00 pmClosed
SE
SE, IRRIGATION WORK CIRCLE, 9 SAPRU ROAD, CIVIL LINE, PRAYAGRAJ
Restoration of Jari Dy. from Km. 10.215 to km. 19.000 and demarcation of canal land.
2026_UPIDC_1113784_1
05/SE/2025-26
Open Tender
Civil Works
540 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.7 L
24 Mar 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
20 Feb 2026
9 Feb 2026
Dismentaling of stone masonry in CM with proper disposal of dismentaled material with all lead & lift including labour , material, T&P etc. as per direction of engineer in - charge.
Dismentaling of RCC work its proper disposal & stacking of dismentaled material with lead & lift including labour , material, T&P etc. as per direction of engineer in - charge.
Dismentaling of CC work its proper disposal of dismentaled material with lead & lift including all type of labour , material, T&P etc. as per direction of engineer in - charge.
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Preparation of Sub-grade for Lining excluding cost of earth work.
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast Poly Plus Tar paper including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying R.C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
E/W removing of diversion including all lead & lift, cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick , filling joint with sand including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
docPDF_TONS.pdf
Tender Documents • 2.60 MB
BOQ_2063587.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid