Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.5 L+₹1,550 (1.05%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.7 L+₹18,271.75 (12.4%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹2.0 L+₹53,426.75 (36.3%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹2.4 L+₹92,731 (62.9%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹1.2 L
EMD Value
₹2,955
Closing Date
5 Jun 2020, 5:00 pmClosed
Executive Officer MC Solan
Executive Officer MC Solan
Construction of C.C road and retaining Wall PWD Colony Ward No 6 Solan .
2020_UDDHP_37526_1
TEN(5)20/2019-2240,13/05/2020
Open Tender
Civil Works
Item Rate
90 days
MC Solan
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Officer MC Solan
₹2,955
22 Jun 2021
26 May 2020
6 Jun 2020
26 May 2020
5 Jun 2020
26 May 2020
Amount
Earth work in excavation for structures in all depths as per drawings and technical specification as per Clause 305.1(Three hundred Five point One) of MORD specifications 300 (three hundred) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated Suitable materials.as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Disposal of all Excavated Earth by mechanical transport up to 5km.as per H.P. PWD. Specification, including carriage of all labour, equipment and materials to various locations through all modes of transportation in all leads and lifts, including all incidental charges.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand :12 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centring and shuttering in: Foundation and plinth. as per HP.PWD specification, including carriage of all labour equipment and materials to various location through all modes of transportation in all leads and lifts , including all incidental charges .
Providing and fixing on wall face PVC (D-Plast) rain water pipes of working pressure not less than 4.5 kg/sqm including filling the joints withapproved adhesive complete. 150mm dia pipes
Providing and laying cement concrete 1:3:6 (1Cement,3Sand,6 aggregates 20mm nominal size) and curing complete including cost of form work in foundation and plinth.
Steel work welded in built up sections, trusses and framed work, including cutting, hoisting in all heights and levels, fixing in position and applying a priming coat of red lead paint completer in all respect as per structural design, drawing ,direction of the Engineer-in-Charge and as per HP.PWD. Specification 1990 volume-I, including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges. ii) In gratings framed guard bars, ladders, railing, brackets and similar works.
Bhupender Jaswal Contractor
Vinay SHarma
Rahul Sharma
Subhash Chand Rana
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .