Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-AOC | ₹26.4 L | L1 | Accepted-AOC Accepted,BeingL-1 |
| 2 | L2₹27.1 LRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹27.1 L | L2 | Rejected-Finance Rejected,BeingL-2 |
| 3 | L3₹28.0 LRejected-Finance C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹28.0 L | L3 | Rejected-Finance Rejected,BeingL-3 |
| Sl No | Description | Qty | Unit | RAHUL KUMAR MOURYA L1 | M/S OM BALA JEE CONSTRUCTION L3 | M/S SINGH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and thorny jungle without uprooting. labour,material and T & P etc. | 46,340 | M2 | 4.99 ₹2.3 L | 5.28 ₹2.4 L | 5.1 ₹2.4 L |
| 2.00 | Silt clearance/trench digging in wetted drain including all lift and lead , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge. | 6,468 | M3 | 55.85 ₹3.6 L | 59 ₹3.8 L | 57.5 ₹3.7 L |
| 3.00 | Silt clearance/trench digging in under water in drain including all lift and lead, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge. | 14,275 | M3 | 69.1 ₹9.9 L | 73 ₹10.4 L | 71.25 ₹10.2 L |
| 4.00 | Silt clearance/trench digging in under water in drain with for slush and lehel including all lift and lead , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge. | 9,810 | M3 | 95.6 ₹9.4 L | 103 ₹10.1 L | 97.75 ₹9.6 L |
| 5.00 | Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning as per direction of Engineer in charge as per direction of Engineer in charge. | 23,160 | M2 | 4.77 ₹1.1 L | 5.25 ₹1.2 L | 4.9 ₹1.1 L |
| 6.00 | Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/ Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge. | 6.7 | km | 1,874 ₹12,555.80 | 4.85 ₹32.50 | 1,956 ₹13,105.20 |
Tender Value
₹28.0 L
EMD Value
₹56,000
Closing Date
9 Jun 2025, 11:00 amClosed
Executive Engineer, Head works Division, Sarda can
Executive Engineer, Head works Division, Sarda canal Bareilly.
Nai Sharda Deva poshak Nahar ke Tel Fall ke Neeche duni bairaj ko jane bali Drain kee Saaf- Safai ka karya.
2025_UPIDC_1043277_1
E-Tender Notice No 02/EE/2025-26
Open Tender
Civil Works - Canal
30 days
Banbasa
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹56,000
Yes
Executive Engineer, Head works Division, Sarda can
3 Feb 2026
28 May 2025
9 Jun 2025
28 May 2025
9 Jun 2025
28 May 2025
29 May 2025
Amount
Cleaning thick bushes and thorny jungle without uprooting. labour,material and T & P etc.
Silt clearance/trench digging in wetted drain including all lift and lead , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge.
Silt clearance/trench digging in under water in drain including all lift and lead, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge.
Silt clearance/trench digging in under water in drain with for slush and lehel including all lift and lead , including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction as per direction of Engineer in charge.
Removing sewar and jalkumbhi from main canal branches & distributaries, escapes & its disposal at toe of bank & destroying by burning as per direction of Engineer in charge as per direction of Engineer in charge.
Videography/Photography of silt clearance works in canal and drains before, during and after silt clearance by DRONE as per requirement including supply of Videography/ Photography in Pen Drive and vehicles for movement as per direction of Engineer in charge.
M/S SINGH CONSTRUCTION (BID ID -5239684)
M/S OM BALA JEE CONSTRUCTION (BID ID -5239486)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid