| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.3 L+₹45,540.78 (1.34%)Accepted-AOC | L2 | Accepted-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹71,000
Closing Date
22 Jul 2021, 3:00 pmClosed
The Project Director
DRDA, VELLORE
VELLORE District PMGSY Periodic Renewal Road 2020-21 with 5 Year Maintenance in Anaicut Block Package No-TN26 17R - No of Works -02
2021_RDTN_111393_1
A9/1107/2021
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹71,000
8 Sept 2021
29 Jun 2021
22 Jul 2021
29 Jun 2021
22 Jul 2021
29 Jun 2021
Amount
Periodic Renewal of BT road from AP Road to Agararajakuttai road in Agaram Panchayat
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Earth work excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complete,as per MOST specification as per SS20 A.
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG metal including cost and conveyance of all materials etc
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.2mm metal IRC size HBG metal including cost and conveyance of all materials etc
Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A or Type B or Type C as per Technical Specification Clause 510.
Provision for KM Stone
Provision for HM Stone
Provision for Logo Board
Provision for Name Board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Perodical Renewal of BT Road from Kuppampalayam to Kattukollai in Kuppam Palayam Panchayat
Clearingthe Scrub jungle including cutting the scrubs and removing away from site etc.complete
Earth work excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complete,as per MOST specification as per SS20 A.
Providing and laying Gravel for Sideberm including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% compaction
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 50mm using 45mm metal IRC size HBG metal including cost and conveyance of all materials etc
Advance patch for making up the undulation in the exiting B.T surface to an average thickness of 25mm using 13.2mm metal IRC size HBG metal including cost and conveyance of all materials etc
Applying tackcoat over BT Surface using 3kgs of bitumen emulsion per 10sqm including cost of bitumen emulsion which will be supplied deparmentallyat section stores cost of which will be recovered at the issue rate as per the special condation for etc Complete
Providing and laying pre-mix carpet 20mm thickness using 0.18 cum of 13.2 IRC macine crushed metal 0.09 cum of 11.2 mm IRC machine crushed metal with 13.432KG of Bitumen with 1.168 KG plastic Waste for pre-mixing 10 sqm of premix carpet and laying seal coat type "A" using 0.09 cum of 6.70 mm IRC HBG chips with 9.80 Kg of bitumen for 10 sqm including cost and conveyence of materials
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-A or Type B or Type C as per Technical Specification Clause 510.
Provision for HM stone
Provision for Name Board
Provision for logo board
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
J K CONSTRUCTIONS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .