| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.9 LAdmitted-Finance | -16.00% | ₹35.9 L | L1 | Admitted-Finance |
| 2 | L2₹36.3 LAdmitted-Finance | -14.99% | ₹36.3 L | L2 | Admitted-Finance |
| 3 | L2₹36.3 LAdmitted-Finance | -14.99% | ₹36.3 L | L2 | Admitted-Finance |
Tender Value
₹42.7 L
EMD Value
₹42,800
Closing Date
26 Feb 2026, 5:30 pmClosed
PA ITDA Malkangiri
ITDA OFFICE NEAR TELEPHONE EXCHANGE, DNK, MALKANGIRI
Construction of Additional Classroom at SSD Girls HSS MV-79 in Kalimela Block
2026_STSCD_125852_16
ITDAMKG-11/2025-26
Open Tender
Civil Works - Buildings
120 days
Malkangiri
B Class
2 documents required · 2 mandatory
₹6,000
₹42,800
Yes
8 Jun 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
R.C.C. work (M-25) in plinth band, slab, chajja having a minimum compressive strength (in work test) of 150 Kg/cm sqm in 15 cm. Cubes at 28 days with IS 456 and 516 using 12 mm to 20 mm size (20mm Not to exceed 25 %) hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering, laying and compaction concrete watering an curing for 4 weeks, (Including centering, shuttering) and finishing the exposed surfaces smooth with cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete in all respect but excluding the cost and conveyance of HYSD/ M.S. rods or Tor steel (SAIL) and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. rods of Tor steel and binding wire and tying the grills and placing in proper position as directed by the E.I.C a) Column base 1st Floor
b) Beams & columns 1st Floor
c) Lintel 1st Floor
d) Chajja 1st Floor
e) Roof Slab 1st Floor
Cement concrete solid block masonry work in Cement Mortar (1:6) in superstructure using Brick of 30 cm x 20 cmx 15 cm size having crushing strength not less than 35 kg per sq. km including splays , cutting, circular moulding , chamfering and cobelling , watering, curing etc. completed as per direction of the E.I.C 1st Floor
Supplying, fitting, and placing uncoated HYSD bar reinforcement as per drawing & Labour for Straightening, cutting, bending Binding, Cranking, Hooking and jointing (if required) HYSD rod (SAIL)and tying the grills, hoisting and placing in proper position as required for R.C.C. works including cost, conveyance and all taxes of HYSD steel rods and binding wires of 18 to 20 gauge with cost of labour and T & P required for the work etc. with all lead lift and delift complete in all respect to the specification and as directed by the Engineer-in-charge 1st Floor
Supplying, fitting & fixing of M.S Door shutters & MS Windows shutters in proper position including making holes in walls, RCC structures and wood work, etc. making good to the damages to walls, or RCC structures including mending or cuting to sizes or grooves in walls with cost, conveyance, royalities with all T &P labour, etc. complete in all respect as per the direction of EIC. 1st Floor
Providing fitting and fixing of Flush Door out of 32 mm thick FRP block board including of all fittings and including of all fittings and including cost and coneveyance of all materials to site, and all labour charges complete as per direction of E.I.C 1st Floor
Supplying all materials, labour, T&P etc. and Fitting and fixing of Vetrified tiles in floors of size 600 mm x 600 mm of approved make conforming to IS:13755 laid on 20 mm thick C.M (1:4) and filling joints with white cement including cost, conveyance, taxes, royalities of all materials and all labour T&P required for the work etc. complete in all respect as per direction of E.I.C. 1st Floor
Supplying, Fitting, Fixing of Ceramic tiles in dados, skirting and risers of steps on 12mm thick C.P. (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles with rubbing and polishing complete including cost, conveyance of pre cast tile with all labour T&P, taxes etc. complete as per direction of the E.I.C. 1st Floor
Fixing Ceramic tiles in floor, steps, treads and landing on 20 cm thick of C.M. (1:3) jointed with neat cement slurry mixed with pigment to match the shades of tiles including rubbing and polishing complete including cost, conveyance of precaste tile with all labour T&P taxes etc. complete as per direction of the E.I.C. 1st Floor
12mm thick cement plaster (1:6) finished smooth to out side brick walls after racking out the joints cleaning & finishing the plaster surface smooth including wash and screening the sand free from dust, dirt and other foreign materials by proper sieiving and grade, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete with all lead lift and delift complete in all respect to the specification and proper grade and as directed by the Engineer-in-charge. 1st Floor
16mm thick cement plaster (1:6) finished smooth to out side brick walls after racking out the joints cleaning & finishing the plaster surface smooth including wash and screening the sand free from dust, dirt and other foreign materials by proper sieiving and grade, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete with all lead lift and delift complete in all respect to the specification and proper grade and as directed by the Engineer-in-charge. 1st Floor
6mm (1/4") thick Cement Plaster in C.M (1:4) finished smooth to to R.C.C. surfaces including closed deep chipping & slury treatment, watering and curing, scaffolding screening sand etc. complete with cost, conveyance, taxes and royalties of all materials and labour with T & P required for the work etc. complete in all respect as per the direction of the Engineer-in-charge. 1st Floor
Finishing wall surface of walls with Acrylic wall putty ( water based ) and finished smooth and even suface to receive painting including all cost of materials, scaffolding, labour, watering & curing T&P etc complete as per direction of Engineer-in-charge. 1st Floor
Providing and painting with two coats to the entire outside surface with silcon based weather coat paint over plastered surface of any approved make to the outer surface after scraping and cleaning the surface including all cost of materials, scaffolding,labour, watering, & curing T & P ec. complete and as per direction of the E.I.C. 1st Floor
Distempering two coats over one coat of primer on inside wall surface and ceiling of approved shade including cost of Distemper with conveyance, taxes, lifts of all materials and labours, T & P etc. required for the work complete with all respect including scaffolding as directed by the Engineer-in-charge. 1st Floor
Painting two coats with approved plastic enamel paints over a coat of primer to new wood work and iron works including sand papering polishing the surface with all cost, conveyance, royalty and all taxes of materials including cost of paints and primer, cost of labour and T&P etc. required for the work complete in all respect as directed by the E.I.C. 1st Floor
Supplying, fitting and fixing of window (sliding type) made up Aluminium section 9778 as window frame, section no. 4095,4096 and 9777,3994 as shutter frame with 5mm thick glasss as panel fitted with rubber beading including locking arrangement including all fitting including cost of all material, taxes labour T&P including cost of glass etc. complete as per direction of Engineer-in-charge. 1st Floor
2.5 cm thick grading concrete with C.C. (1:2:2) on roof slab with 6 mm size c.b.h.g. chips after chipping and chiselling the same and cleaning the surfaces by wire brushing laid to proper slope finished smooth to receive tarfelt treatment watering and curing including cost. Conveyance, royalty and taxes of all materials, labour T & P required for the work complete with all respect as per direction of E.I.C. 1st Floor
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_580718.xls
BOQ • 0.36 MB
DTCN11.pdf
Tender Documents • 3.23 MB
Download all tender documents and submit your bid