| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAdmitted-Finance | ₹15.9 L | L1 | Admitted-Finance |
| 2 | L2₹16.5 LAdmitted-Finance | ₹16.5 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G.ANGAMUTHU CONTRACTOR L1 | PAVITHRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00NCTPS –I- CM Circle – CM-II- Filling the low lying area opposite to old CM-II office to avoid stagnation of water and to develop green belt at NCTPS-I premises (Reach-I). | |||||
| 1.01 | Clearing the heavy jungle including cost of all labours and T&P and disposing away from site as instructed by the Engineer at site, lead, lift, etc., complete. | 6,264 | sqm | 14 ₹87,696 | 17 ₹1,06,488 |
| 1.02 | Excavation and transporting of excess earth / silt /ash available at the ash dyke, filling at NCTPS-I site and leveling including cost of all materials, transport, loading, unloading, labour charges, T&P etc., complete and as directed by the departmental Engineer at site. (Earth/silt/ash will be supplied by TNPGCL at free of cost from Ash dyke) | 3,435 | cum | 239 ₹8,20,965 | 245 ₹8,41,575 |
| 1.03 | Filling with gravel at NCTPS-I site and leveling to the required level including cost of gravel, transport, loading, unloading and labour charges, T&P etc., complete and as directed by the departmental Engineer at site | 1,145 | cum | 599 ₹6,85,855 | 609 ₹6,97,305 |
Tender Value
₹19.4 L
EMD Value
₹19,300
Closing Date
4 Dec 2025, 2:00 pmClosed
SE/CM/NCTPS-I
NCTPS-I Chennai -120
Filling the low lying area opposite to old CM_II office to avoid stagnation of water and to develop green belt at NCTPS_I premises Reach_I.
2025_EB_624686_1
CE /NCTPS-I/SE/ CM/114/2025-26
Open Tender
Civil Works
60 days
CE/NCTPS-1
Refertenderdocument
2 documents required · 2 mandatory
₹0
₹19,300
Yes
9 Mar 2026
19 Nov 2025
5 Dec 2025
19 Nov 2025
4 Dec 2025
19 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: CE/NCTPS-I
Name of Work:NCTPS –I- CM Circle – CM-II- Filling the low lying area opposite to old CM-II office to avoid stagnation of water and to develop green belt at NCTPS-I premises (Reach-I).
Contract No: CE/SE/CM/NCTPS-I/114/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 NCTPS –I- CM Circle – CM-II- Filling the low lying area opposite to old CM-II office to avoid stagnation of water and to develop green belt at NCTPS-I premises (Reach-I).
1.01 Clearing the heavy jungle including cost of all labours and T&P and disposing away from site as instructed by the Engineer at site, lead, lift, etc., complete. Item 1 6264 sqm Excess(+) Full Conversion INR
1.02 Excavation and transporting of excess earth / silt /ash available at the ash dyke, filling at NCTPS-I site and leveling including cost of all materials, transport, loading, unloading, labour charges, T&P etc., complete and as directed by the departmental Engineer at site. (Earth/silt/ash will be supplied by TNPGCL at free of cost from Ash dyke) Item 2 3435 cum Excess(+) Full Conversion INR
1.03 Filling with gravel at NCTPS-I site and leveling to the required level including cost of gravel, transport, loading, unloading and labour charges, T&P etc., complete and as directed by the departmental Engineer at site Item 3 1145 cum Excess(+) Full Conversion INR
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_747022.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid