| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹19.5 L+₹68,059 (3.62%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹20.1 L+₹1.3 L (6.81%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | P JAYARAJAN WORKS CONTRACTOR L2 | RAJ CONSTRUCTIONS L3 | P JAYACHANDRAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling and removing of PCC including cost of all labour charges etc., complete. | 83 | M3 | 300 ₹24,900 Lowest | 400 ₹33,200 | 422 ₹35,026 |
| 2.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 . | 175 | M3 | 250 ₹43,750 | 170 ₹29,750 Lowest | 178 ₹31,150 |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification. | 57 | M3 | 4,800 ₹2,73,600 | 4,318 ₹2,46,126 Lowest | 4,471 ₹2,54,847 |
| 4.00 | Centering charges for plain cement concrete work including cost & labour charges etc as per standard specification. | 1,114 | M2 | 1 ₹1,114 Lowest | 350 ₹3,89,900 | 429 ₹4,77,906 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 161 | M3 | 7,400 ₹11,91,400 | 5,400 ₹8,69,400 Lowest | 5,666 ₹9,12,226 |
| 6.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) | 2.5 | M3 | 7,700 ₹19,250 | 6,700 ₹16,750 Lowest | 7,073 ₹17,682.5 |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 300 | Kg | 100 ₹30,000 | 75 ₹22,500 Lowest | 77 ₹23,100 |
| 8.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 273 | M2 | 250 ₹68,250 Lowest | 350 ₹95,550 | 475 ₹1,29,675 |
| 9.00 | GST 18% | 1 | No | 2,97,407.5 ₹2,97,407.5 Lowest | 3,06,571.68 ₹3,06,571.68 | - |
Tender Value
₹26 L
EMD Value
₹26,000
Closing Date
29 May 2025, 3:00 pmClosed
Commissioner Kuzhithurai municipality
kuzhithurai municipality
Construction of Strom Water Drain at C.K.P.ROAD TO PERUMTHERU FISH MARKET -2 (Unicode No 149007R033), EDAIKULAM TO KALLUKETTI -1 (Unicode No 149008R038), DEVAN VILAI TO CHRISTHURAJA PURAM (Unicode No 149013R068) in w no 7, 8, 13 in KMC
2025_MAWS_560000_1
1232/2025/E1
Open Tender
Civil Works - Others
Works
90 days
kuzhithurai municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹26,000
kuzhithurai municipality
23 Oct 2025
20 May 2025
29 May 2025
20 May 2025
29 May 2025
20 May 2025
22 May 2025
stage.html
html • 0.03 MB
technical_668790.pdf
techsummary_668790.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.80 MB
Tendernotice_2.pdf
PDF • 0.63 MB
BOQ_668790.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .