| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹21.2 L+₹62,262.22 (3.03%)Rejected-Finance | L2 | Rejected-Finance 2nd bidder |
Tender Value
₹20.8 L
EMD Value
₹41,600
Closing Date
16 Sept 2026, 5:00 pmClosed
Executive Engineer
HPPWD Divisional office
As per SBD
2026_PWD_143175_1
NIT-6407-6506 Dt. 08.09.2026
Open Tender
Civil Works - Roads
Percentage
75 days
Main road
As per SBD
9 documents required · 9 mandatory
₹500
Yes
₹41,600
Yes
5 Oct 2026
11 Sept 2026
17 Sept 2026
11 Sept 2026
16 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork by mechanical means ( Hydraulic excavator ) / manual means in foundation trenches or drains for all all kind of soil and ordinary rocks including dressing of sides ramming of bottoms upto all lifts including getting out the excavated soil and disposal of surplus excavated soil as leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government exclusive GST. | 125.4 | Per Cubic Meter | 220 | ₹27,588 |
| 2 | Providing and laying of boulder apron laid in wire crate with 4mm dia G.I. wire conforming Is: 280 and Is:4826 in 100x100mm mesh including 10 per cent extra and joints laid with stone boulders weighing not less than 25kg each as per drawing and technical specification clause 1301 including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government exclusive GST. | 230.47 | Per Cubic Meter | 2,900 | ₹6,68,363 |
| 3 | Removal of land slide in hilly area in ordinary rock not requiring blasting by mechnical means including cutting and trimming of slopes as per norms and IRC specification 48-1998 including carriage of all labour material and equipments to various location through all modes of transportation as per HPPWD specification 1990 vol.1 and as per direction of Engineer in Charge at site in all leads and lifts. Any loss to the public and private property during the course of removal of slips shall be absolute resposibility of the contractor which shall have to be duly compensated by him in all cases. including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, or other taxes imposed by the Government exclusive GST. | 6,843.9 | Per cubic metre . | 201.56 | ₹13,79,456.48 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
SBD.pdf
Tender Documents • 11.32 MB
BOQ_212696.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .