Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | ₹8.9 L Quoted ₹10.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.0 LRejected-AOC | ₹11.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S.MURUGESAN | AKASH UNITECH SERVICES |
|---|---|---|---|---|---|
| 1.00 | Cleaning of all collection chambers/ gully trap, branch and main sewer lines of sewage system by cleaning, removing of chocking, growth of roots, sludge and deposited earth once in 15 days including cost of all labour, material, lead, lift, disposing the sludge waste as directed by the Engineer in charge of work, etc., complete. a) Collection chambers/ Gully traps | 12,288 | Rm | 7,12,704 ₹8.4 L | 6,75,840 ₹8.0 L |
| 1.20 | Branch sewer line | 2,200 | Rm | 1,01,200 ₹1.2 L | 99,000 ₹1.2 L |
| 1.30 | Main sewer line | 4,876 | Rm | 2,24,296 ₹2.6 L | 2,19,420 ₹2.6 L |
| 2.00 | Removing the spreaded polythene and other waste papers around the residential area by picking with necessary T and P and disposing the collected materials @ 2km away from the Camp II premises including cost of all labour, lead, lift etc complete. | 96 | Opn | 58,656 ₹69,214.08 | 57,600 ₹67,968 |
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
19 Jan 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Cleaning of Collection Chambers, Branch and Main Sewer Lines and Removing the spreaded polythene and other waste papers at Analmin Nagar for the period from 01.04.2026 to 31.03.202
2025_EB_637204_1
CE SE C TTPS Spec.No. 45 26 27
Open Tender
Civil Works - Others
365 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,300
Yes
25 Mar 2026
29 Dec 2025
20 Jan 2026
29 Dec 2025
19 Jan 2026
29 Dec 2025
Cleaning of all collection chambers/ gully trap, branch and main sewer lines of sewage system by cleaning, removing of chocking, growth of roots, sludge and deposited earth once in 15 days including cost of all labour, material, lead, lift, disposing the sludge waste as directed by the Engineer in charge of work, etc., complete. a) Collection chambers/ Gully traps
Branch sewer line
Main sewer line
Removing the spreaded polythene and other waste papers around the residential area by picking with necessary T and P and disposing the collected materials @ 2km away from the Camp II premises including cost of all labour, lead, lift etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_762612.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid