Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹136 (0.10%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.4 L+₹136 (0.10%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹6,800
Closing Date
24 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONDTRUCTION OF TILE PATH FROM HOUSE OF GULLA MALLA TO HOUSE OF YOUNIS PARRAY AT CHAREHAR
2026_RDPR_318826_3
NIT_27_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
S K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Yes
Executive Engineer REW Budgam
₹6,800
Yes
14 Sept 2026
31 Jul 2026
25 Aug 2026
31 Jul 2026
24 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Engangement of labours for site clearance, removal of malba, etc | 1 | NO | 650 | ₹650 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.71 | CUM | 5,202.9 | ₹40,114.36 |
| 0_) | P/L in 50mm thick factory made cement concrete interlocking paver block of M30 grade made by block making machine with strong vibratory compaction and of appr size and design laid in required colour incl 50 mm thick compacted bed of fine sand | 110.11 | SQM | 816.15 | ₹89,866.28 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc:Coarse Agg./Aggregrate for an average lead of 15 Km | 6.94 | CUM | 344.15 | ₹2,388.4 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: Sand/Fine Agg. for an average lead of 10 Km | 3.47 | CUM | 279.04 | ₹968.27 |
| 0_) | Carraige of by mechanical transport from source to site i/c loading unloading, taxes royalties etc: cement and tiles | 1 | Trip | 1,000 | ₹1,000 |
| 0_) | Add provisions for signboard, Photographes and other unforseen items. | 1 | job | 1,014 | ₹1,014 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1052810.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .