Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.8 LAccepted-Finance | ₹66.8 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹67.7 L+₹96,747.06 (1.45%)Rejected-Finance | ₹67.7 L+₹96,747.06 (1.45%) | L2 | Rejected-Finance Being higher rates |
Tender Value
₹64.5 L
EMD Value
₹1.3 L
Closing Date
31 Jul 2026, 5:00 pmClosed
Executive Engineer
Theog Division, HPPWD., Theog
C/O PCC B/wall at Rd 4/270 to 4/295,12/390 to 12/405,14/990 to 15/020,15/200 to 15/210 R/wall 6/270 to 6/280,6/390 to 6/410,9/580 to 9/595,9/600 to 9/615,11/250 to 11/260,12/090 to 12/105,12/420 to 12/435,12/640 to 12/650, 14/600 to 14/620, 15/270-28
2026_PWD_139740_1
PW.THD/CB-tender/2026-3767-81
Open Tender
Civil Works - Roads
Percentage
90 days
HPPWD
As per GCC
14 documents required · 14 mandatory
₹2,000
₹1.3 L
25 Aug 2026
23 Jul 2026
1 Aug 2026
23 Jul 2026
31 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material including all leads and lifts as per direction of the Engineer-in-Charge. (Ordinary Soil) | 965.85 | Per cubic meter | 214.1 | ₹2,06,788.49 |
| 2 | Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specifiction clause 802,803,1202 and 1203. including all leads and lifts as per direction of the Engineer-in-Charge. (1:4:8) 25 mm nominal size) | 1,226.82 | Per cubic meter | 4,800 | ₹58,88,736 |
| 3 | Provding and fixing weapholes in brick masonry/stone masnory, plain RCC abutment, B/wall, R/wall with 100 mm dia PVC pipe i/c all leads and lifts. as per direction of the Engineer-in-Charge | 580 | Each | 242.15 | ₹1,40,447 |
| 4 | Back Filling behind abutment wing wall/and R/wall complete as per drawing & technical specification clause 1204.3.8 | 203.6 | Per cubic meter | 1,050 | ₹2,13,780 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_207147.xls
BOQ • 0.29 MB
GCC.pdf
Tender Documents • 5.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .