| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.2 CrAdmitted-Finance AT BELGAON SAINTALA BALANGIR 767032 | BALANGIR | BALANGIR | ODISHA | 767032 | L1 | Admitted-Finance | ||
| 2 | L2₹14.2 Cr+₹2.1 L (0.14%)Admitted-Finance BHUBANESWAR | BHUBANESWAR | BHUBANESWAR | ODISHA | L2 | Admitted-Finance | ||
| 3 | L3₹14.3 Cr+₹12.2 L (0.86%)Admitted-Finance S O MENEJAR NAYAK BRAHMIN STREET GP PO BISSAMCUTTACK BLOCK PS BISSAMCUTTACK DIST RAYAGADA ODISHA PIN 765019 | RAYAGADA | ODISHA | 765019 | L3 | Admitted-Finance | ||
| 4 | L4₹14.6 Cr+₹37.1 L (2.61%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹15.8 Cr+₹1.6 Cr (11.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹18.7 Cr
EMD Value
₹18.7 L
Closing Date
7 Aug 2026, 5:00 pmClosed
The Additional Chief Engineer, OTDC Ltd, BBSR
O/o The Additional Chief Engineer, OTDC Ltd, BBSR
Integrated Development of Khandagiri Phase I
2026_OTDC_136975_1
Integrated Development of Khandagiri Phase I
National Competitive Bid
Civil Works - Buildings
Percentage
540 days
Khandagiri
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹18.7 L
Yes
12 Oct 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including ordinary soil, hard/gravelly soil and stony earth mixed with stone and boulders etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. | 5,586.88 | CUM | 311.5 | ₹17,40,313.12 |
| 3 | Filling foundation trenches and plinth with excavated earth (excluding rock) including laying the earth in layers not exceeding 23.5cm (9”) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. | 1,862.3 | CUM | 173.1 | ₹3,22,364.13 |
| 4 | Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for complete the work as per direction of the Engineer-in-charge. | 3,776.03 | CUM | 593.5 | ₹22,41,073.81 |
| 5 | Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 100 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for complete the work as per direction of Engineer-in-charge. | 1,328.01 | CUM | 6,343.1 | ₹84,23,700.23 |
| 6 | Providing, lifting, hoisting and laying Reinforced cement concrete work of M-25 grade having minimum compressive strength of 250kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for complete the work in all respects as per drawing, design and direction of Engineer-in-charge. (But excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills.) | - | - | - | - |
| 7 | Foundation | 192.78 | CUM | 7,153.5 | ₹13,79,051.73 |
| 8 | Plinth Beam | 54.84 | CUM | 8,027.8 | ₹4,40,244.55 |
| 9 | Beam & Column | 57.48 | CUM | 16,536.4 | ₹9,50,512.27 |
| 10 | Wall | 256.88 | CUM | 14,392 | ₹36,97,016.96 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
DTCN.pdf
Tender Documents • 3.38 MB
BOQ_603153.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .