Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.7 LAdmitted-Finance NURSERY SCHOOL 1 SECTOR 33 SUNCITY KURUKSHETRA ROAD KAITHAL 136027 HARYANA | KAITHAL | KAITHAL | HARYANA | 136027 | L1 | Admitted-Finance | |
| 2 | L2₹81.7 L+₹3.0 L (3.83%)Admitted-Finance KOHLI NO 17509 GALI KHADDAR BHANDAR WALI BHI WALA ROAD BATHINDA PB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | L2 | Admitted-Finance | |
| 3 | L3₹82.2 L+₹3.4 L (4.37%)Admitted-Finance PLOT NO 46 WARD NO 08 OPPOSITE RADIO TOWER SAGAR ROAD TILAK NAGAR BIKANER 334003 RAJ | BIKANER | BIKANER | RAJASTHAN | 334003 | L3 | Admitted-Finance | |
| 4 | L4₹83.5 L+₹4.7 L (6.02%)Admitted-Finance BHAGAT SINGH CHOWK SURATGARH 335804 DISTT SRIGANGANAGAR RAJ | GANGANAGAR | RAJASTHAN | 335804 | L4 | Admitted-Finance | |
| 5 | L5₹90.3 L+₹11.5 L (14.7%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Shree Ram Enterprises L4 | M/s BHUPINDRA ENGINEERING WORKS L2 | M/S BUDHRAM BISHNOI L3 | M/S GODARA CONSTRUCTION CO. L1 | PACHAR BROTHERS L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (reinforced) in landing slab ,chullah hoods ,manhole covers , Roofs ,Floors, beams, stair case, landing, chajja and similar suspended work complete all as specified and as directed by Engineer-in-Charge. | 92 | Cum | 890 ₹81,880 | 300 ₹27,600 Lowest | 669 ₹61,548 | 500 ₹46,000 | 400 ₹36,800 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed by Engineer-in-Charge. | 1,228.97 | Sqm | 22 ₹27,037.34 | 30 ₹36,869.1 | 29 ₹35,640.13 | 20 ₹24,579.4 Lowest | 100 ₹1,22,897 |
| 3.00 | M&L for Vitrified ceramic tiles 8 to 9 mm thick 600x 1200 mm Double charged light shade polislhed area of each tiles exc 0.42 sqm and not exceeding 1.0 Sqm in floors set and jointed in neat cement slurry and with epoxy spacer coloured to match, 20mm thick screed bed or bedding layer CM 1:4 for laying finishes complete all as specified and as directed by Engineer-in-Charge. | 675.97 | Sqm | 1,300 ₹8,78,761 | 1,150 ₹7,77,365.5 | 1,029 ₹6,95,573.13 Lowest | 1,150 ₹7,77,365.5 | 1,500 ₹10,13,955 |
| 4.00 | All as per item No 3 hereinbefore but as in vertical surfaces such as skirting, dados & risers to steps etc over 10 mm thick backing plaster in CM 1:4 complete all as specified and directed by Engineer-in-Charge. | 68 | Sqm | 1,400 ₹95,200 | 1,150 ₹78,200 | 1,029 ₹69,972 Lowest | 1,150 ₹78,200 | 1,500 ₹1,02,000 |
| 5.00 | M&L for Glazed ceramic coloured tiles with highlighter in vertical surface 300x600x7-8mm thick set and jointed in neat cement slurry and pointed in white or colour cement to match including 10 mm thick rendering in CM 1:4 on other than fair face of brick work complete all as specified and as directed by Engineer-in-Charge. | 160 | Sqm | 1,020 ₹1,63,200 | 900 ₹1,44,000 Lowest | 1,029 ₹1,64,640 | 1,150 ₹1,84,000 | 1,500 ₹2,40,000 |
| 6.00 | M&L for Joint less Non - skid Matt finish Vitrified tiles 395x 395 size 10 to 12 mm thick, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 290 | Sqm | 1,280 ₹3,71,200 | 900 ₹2,61,000 Lowest | 999 ₹2,89,710 | 1,200 ₹3,48,000 | 1,200 ₹3,48,000 |
| 7.00 | All as per item No 6 hereinbefore but as in vertical surfaces such as skirting, dados & risers to steps etc over 10 mm thick backing plaster in CM 1:4 complete all as specified and directed by Engineer-in-Charge. | 15 | Sqm | 1,300 ₹19,500 | 900 ₹13,500 Lowest | 999 ₹14,985 | 1,200 ₹18,000 | 1,200 ₹18,000 |
| 8.00 | M&L for Joint less Non - skid Ceramic tiles 395x 395 size 7 to 8 mm thick, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 20 | Sqm | 1,000 ₹20,000 | 900 ₹18,000 | 999 ₹19,980 | 700 ₹14,000 Lowest | 1,000 ₹20,000 |
| 9.00 | Demolition of tiles or stone slabs of any description or thickness in floors laid, bedded and pointed in mortar and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 6.3 | 10 Sqm | 230 ₹1,449 | 300 ₹1,890 | 529 ₹3,332.7 | 1,000 ₹6,300 | 100 ₹630 Lowest |
| 10.00 | M&L for Green Marble 18- 20mm thick machine cut, bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of green marble including grinding and polishing complete including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 53 | Sqm | 1,600 ₹84,800 | 1,600 ₹84,800 | 1,429 ₹75,737 Lowest | 2,150 ₹1,13,950 | 3,000 ₹1,59,000 |
Tender Value
₹76.8 L
EMD Value
₹1.4 L
Closing Date
9 Sept 2026, 6:00 pmClosed
Sh Rakesh Jha, IDSE, SE, CWE
HQ CWE Bikaner Bikaner Military Station
Special repair to Bldg No P-13 (OR Institute, Bldg No P-29 and P-30 (Cook Houses) of Guards at Suratgarh Mil Stn under GE(A) Suratgarh
2026_MES_782731_1
CA No CWE BKN-Token No 28/2026-2027
Open Tender
Civil Works - Others
Works
210 days
suratgarh
Please refer tender documents
7 documents required · 7 mandatory
₹1,000
GE (A) suratgarh
₹1.4 L
Yes
24 Sept 2026
5 Aug 2026
16 Sept 2026
5 Aug 2026
9 Sept 2026
26 Aug 2026
5 Aug 2026 - 19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (reinforced) in landing slab ,chullah hoods ,manhole covers , Roofs ,Floors, beams, stair case, landing, chajja and similar suspended work complete all as specified and as directed by Engineer-in-Charge. | 92 | Cum | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and as directed by Engineer-in-Charge. | 1,228.97 | Sqm | - | - |
| 3 | M&L for Vitrified ceramic tiles 8 to 9 mm thick 600x 1200 mm Double charged light shade polislhed area of each tiles exc 0.42 sqm and not exceeding 1.0 Sqm in floors set and jointed in neat cement slurry and with epoxy spacer coloured to match, 20mm thick screed bed or bedding layer CM 1:4 for laying finishes complete all as specified and as directed by Engineer-in-Charge. | 675.97 | Sqm | - | - |
| 4 | All as per item No 3 hereinbefore but as in vertical surfaces such as skirting, dados & risers to steps etc over 10 mm thick backing plaster in CM 1:4 complete all as specified and directed by Engineer-in-Charge. | 68 | Sqm | - | - |
| 5 | M&L for Glazed ceramic coloured tiles with highlighter in vertical surface 300x600x7-8mm thick set and jointed in neat cement slurry and pointed in white or colour cement to match including 10 mm thick rendering in CM 1:4 on other than fair face of brick work complete all as specified and as directed by Engineer-in-Charge. | 160 | Sqm | - | - |
| 6 | M&L for Joint less Non - skid Matt finish Vitrified tiles 395x 395 size 10 to 12 mm thick, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 290 | Sqm | - | - |
| 7 | All as per item No 6 hereinbefore but as in vertical surfaces such as skirting, dados & risers to steps etc over 10 mm thick backing plaster in CM 1:4 complete all as specified and directed by Engineer-in-Charge. | 15 | Sqm | - | - |
| 8 | M&L for Joint less Non - skid Ceramic tiles 395x 395 size 7 to 8 mm thick, in floors etc. set and jointed in neat cement slurry and pointed in white or coloured cement to match including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 20 | Sqm | - | - |
| 9 | Demolition of tiles or stone slabs of any description or thickness in floors laid, bedded and pointed in mortar and rubbish off the premises complete all as specified and directed by Engineer-in-Charge. | 6.3 | 10 Sqm | - | - |
| 10 | M&L for Green Marble 18- 20mm thick machine cut, bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of green marble including grinding and polishing complete including 15 mm thick screed bed or bedding layer in CM 1:6 complete all as specified and as directed by Engineer-in-Charge. | 53 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender28.pdf
Tender Documents • 1.59 MB
BOQ_876933.xls
BOQ • 0.63 MB
Corrigendum01_T28.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .