Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.9 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹14.2 L+₹2.3 L (19.6%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Rejected-Technical | - | Rejected-Technical Details mentioned in committee report | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.9 L
EMD Value
₹50,000
Closing Date
20 Feb 2020, 4:30 pmClosed
Director
Sports Authority of India, Central Regional Centre, Gram Gora, Bishenkheri, Post Suraj Nagar, Bhopal - 462044
Open Tender Enquiry for Repair and Maintenance Work of Pond at SAI CRC Bhopal
2020_SAI_540810_1
138/SAI/RDCC/R/M/Pond/2020
Open Tender
Civil Works - Others
Works
30 days
Bhopal
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹50,000
Yes
SAI CRC Bhopal
7 Mar 2020
31 Jan 2020
21 Feb 2020
31 Jan 2020
20 Feb 2020
31 Jan 2020
31 Jan 2020 - 14 Feb 2020
14 Feb 2020
Amount
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge (In cement mortar)
Old stone pitching (which is available at site)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (Mild steel and Medium Tensile steel bars)
Centering and shuttering including strutting, propping etc. and removal of form for : (Suspended floors, roofs, landings, balconies and access platform)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing an reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement: 6 coarse sand)
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Laying of stone slab (which is available at site)
Hemant Singh Bais
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .