Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical admitted |
| 2 | Accepted-Technical | Accepted-Technical admitted |
| 3 | Accepted-Technical | Accepted-Technical admitted |
| 4 | Accepted-Technical R O BOGDANG | Accepted-Technical admitted |
| 5 | Accepted-Technical IGOO | Accepted-Technical admitted |
Tender Value
₹91.8 L
EMD Value
₹2.2 L
Closing Date
23 Sept 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal at Baranachan Thang Bogdang.(Under Capex)
2026_PWD_19512_2
35 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
120 days
LEH
Please refer to tender document
4 documents required · 4 mandatory
₹2,000
Payable To Executive Engineer InFC division Leh
₹2.2 L
29 Sept 2026
9 Sept 2026
25 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
A. All kinds of soil 70%. | 1,685.25 | Cum | 278.09 | ₹4,68,651.17 |
| 2 | B. Ordinary rock 30%. | 722.19 | Cum | 504.48 | ₹3,64,330.41 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | 960 | Cum | 6,417.77 | ₹61,61,059.2 |
| 4 | Dumping stone excluding cost of stones. in Horizontal on level | 384 | Cum | 232.68 | ₹89,349.12 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : A.Foundations, footings, bases for columns. | 2,880 | Sqm | 306.15 | ₹8,81,712 |
| 6 | Providing and fixing MS pipes, including cutting, hoisting and carriage complete job. A. 300 mm dia. | 18 | Mtrs | 4,406.77 | ₹79,321.86 |
| 7 | B. 100 mm dia. | 120 | Mtrs | 2,118.64 | ₹2,54,236.8 |
| 8 | Carriage of material by mechanical transport . A. Sand an avg lead of 10 kms | 451.2 | Cum | 271.52 | ₹1,22,509.82 |
| 9 | B. Stone agg an avg lead of 30 kms. | 854.4 | Cum | 476.1 | ₹4,06,779.84 |
| 10 | C. Cement an avg lead of 185 kms. | 211 | M.T | 1,681.63 | ₹3,54,823.93 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_46192.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .