GEMC-511687755907873
Awarded to G.K. Enterprises
₹6.5 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Door change | Door Change | HSN not specified by seller | 1 Nos | 15,000 | 15,000 |
| Color painting of wall of old building includes of labour and all material | Color Painting Of Wall Of Old Building Includes Of Labour And All Material | HSN not specified by seller | 2,000 Sq Ft | 80 | 160,000 |
| Tile work with a material and labour | Tile Work With A Material And Labour | HSN not specified by seller | 1,000 Sq Ft | 80 | 80,000 |
| Scrappping of old walls and plaster work with labour and material | Scrappping Of Old Walls And Plaster Work With Labour And Material | HSN not specified by seller | 6,000 Sq Ft | 40 | 240,000 |
| 15 Drainage pipes 30 feet | 15 Drainage Pipes 30 Feet | HSN not specified by seller | 15 Pipes | 180 | 2,700 |
| Principal office renovation and bathroom renovation include gates, seat, sealingwork, painting ect with labour and material | Principal Office Renovation And Bathroom Renovation Include Gates, Seat, Sealingwork, Painting Ect With Labour And Material | HSN not specified by seller | 1 Nos | 25,000 | 25,000 |
| Sealing work repair | Sealing Work Repair | HSN not specified by seller | 100 Sq Ft | 138 | 13,800 |
| Main gate painting and repair work on walls with granite, name writing of institute 2 place with labour and material | Main Gate Painting And Repair Work On Walls With Granite, Name Writing Of Institute 2 Place With Labour And Material | HSN not specified by seller | 1 Nos | 30,000 | 30,000 |
| Wall repair Behaind the stage | Wall Repair Behaind The Stage | HSN not specified by seller | 30 Sq Ft | 220 | 6,600 |
| Shade over stage with lobour and material | Shade Over Stage With Lobour And Material | HSN not specified by seller | 480 Sq Ft | 160 | 76,800 |