Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹11.8 LAWARDED | ₹11.8 L | AWARDED |
Tender Value
₹14.0 L
EMD Value
₹36,250
Closing Date
18 Jun 2025, 11:00 pmClosed
Rural Development and Panchayat Raj Department
Construction of 1 class room Building Govt Kannada Higher Primary School at Shivabasava nagar village in Belagavi taluk
RDPR/2025-26/BD/WORK_INDENT15651
RDPR/2025-26/BD/WORK_INDENT15651
Open
Buildings
Two Tender Document System(Two Cover)
RDPR Division Office Belagavi
₹500
₹36,250
4 Jun 2025
4 Jun 2025
20 Jun 2025
18 Jun 2025
Construction of 1 class room Building Govt Kannada Higher Primary School at Shivabasava nagar village in Belagavi taluk
Earth work excavation for Foundation by echanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour wit...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates andineaggregates as per relevant IS Codes machine mixed with super p...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding (Add 3 On Rate )All other types Foundation ,sub structure of cross Drainanges. with all lead, lifts, loading ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding .RCC Columns / Shaft (Slip Centering) with all lead, lifts, loading & unloading charges including cost and con...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ra...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 60% On Rate ).RCC Beams / Shaft (Slip Centering) with all lead, lifts, loading & unloadi...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 70% On Rate ).RCC Columns / Shaft (Slip Centering) with all lead, lifts, loading & unloa...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 60% On Rate ).RCC Beams / Shaft (Slip Centering) with all lead, lifts, loading & unloadi...
Providing and laying in positionCementConcretefor all Super structures of building , Road worksWater works, Irrigation works & super structure works of bridges upto 3.50 m height. Thegranite/trap/basa...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 0% On Rate ).RCC Slab / Shaft (Slip Centering) with all lead, lifts, loading & unloading...
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/we...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of ma...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after th...
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remov...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 70% On Rate ).RCC Columns / Shaft (Slip Centering) with all lead, lifts, loading & unlo...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 60% On Rate ).RCC Beams / Shaft (Slip Centering) with all lead, lifts, loading & unload...
Providing and laying in positionCementConcretefor all Super structures of building , Road worksWater works, Irrigation works & super structure works of bridges upto 3.50 m height. Thegranite/trap/basa...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 0% On Rate ).RCC Slab / Shaft (Slip Centering) with all lead, lifts, loading & unloading...
Providing and laying in positionCementConcretefor all Super structures of building , Road worksWater works, Irrigation works & super structure works of bridges upto 3.50 m height. Thegranite/trap/basa...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 0% On Rate ).RCC Slab / Shaft (Slip Centering) with all lead, lifts, loading & unloadin...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) inc...
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/we...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of ma...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Providing Neat cement punning to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing comple...
Providing and laying Polished Glazed Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of...
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per sp...
Providing & fixing of 2-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer...
Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(TitaniumDioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead fr...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel...
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after th...
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remov...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, ...
Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete a...
Providing and fixing in position fully panelled athi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails
180mm wide top rail and stiles 100mm wide as per dra...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture i...
Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give...
Hold fasts . with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments and other incidental charges required for successfull completion of w...
Providing and fixing ISI marked M.S. pressed but hinges bright finished with necessary screws etc- 125x65x2.12mm with all lead, lifts, loading & unloading charges including cost and conveyance of all...
Providing and fixing bright finished brass handles with screws etc. complete: Brass handles 100 mm with plate 150x32 mm with all lead, lifts, loading & unloading charges including cost and conveyance...
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :50x10mm with all lead, lifts, loading & unloading charges including cost and conveyance of al...
Providing and fixing bright finished brass quadrant stay 300 mm long with necessary brass screws etc. complete with all lead, lifts, loading & unloading charges including cost and conveyance of all m...
Providing and laying flamed finish Granite stone flooring in required designand patterns, in linear as well as curvilinear portions of the building all
complete as per the architectural drawings with ...
Electrical Work
Concealed Conduit System Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running ...
Supplying heavy gauge PVC Conduit Pipe ….dia .......mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and ...
Supplying and fixing PVC/metal conduit Deep junction box 25mm deep Junction box )
Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete (10"x7"x3")
Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete. (8"x6"x3")
Supplying and flush mounting teak wooden box without front plank, made of not less than 12mm thick wood, after due groove cutting, Finishing with necessary cement plastering complete (4"x4"x3")
Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulat...
Point wiring using Copper wire with switch. Supplying and wiring adopting loop system in existing PVC Conduit / casing capping using 1100V grade, COPPER conductor flexible multistrand FRLS PVC insulat...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS...
Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Po...
Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double bal...
Extra length of GI pipe of class B 19mm dia for down rod.
Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking ca...
Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking ca...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].