Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.1 L+₹13,320.21 (13.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1.2 L
EMD Value
₹3,600
Closing Date
24 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF PRITICE WICKET AT HSS SRIGUFWARA BLOCK DPORA
2026_RDPR_321119_7
ENIT94of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹3,600
30 Aug 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 12.01 | cum | - | - |
| 0.0 | P/L of stone soling hand packed,incl ramming with heavy rammer incl. all carriage upto site of work | 3.7 | cum | - | - |
| 0.0 | P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level
(1;4;8) stone aggregate 40 mm nominal size aggregate (Including carriage ) | 1.85 | cum | - | - |
| 0.0 | P/L in position cement concrete of specified grade excluding the cost of shuttering and centring finishing and reinforcement all work upto plinth level 1:1.5:3 Mix ( Including carriage | 5.59 | cum | - | - |
| 0.0 | Steel reinforcement for RCC work incl straightening ,cutting, hoisting ,placing, in position all complete (TMT Bars incl. Carriage | 2.79 | qnt | - | - |
| 0.0 | P/F of MS pipes 50mm dia incl. fixing and applying one coat of redoxide primer and two coats of synthetic enamel paint of approved brand and manufacturer incl. fixing of bottom MS plate 12”x12” of 6 mm thick incl. of hooks etc all necessary fixtures complete | 189.07 | kg | 1 | ₹188.88 |
| 0.0 | Centering and shuttering incl shuttering propping etc and removal of form work for foundation footing bases of columns
Foundation and footing bases of column | 11.06 | sqm | - | - |
| 0.0 | Providing and fixing of heavy duty net of thickness 3mm to cover cricket prctice pitch on 3 sides & Top, as per direction of engineer in charge | 108.44 | sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1071129.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .