Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC VILLAGE RATAULI DISTRICT ROHTAK | ROHTAK | ROHTAK | HARYANA | L1 | Accepted-AOC L1 | |
| 2 | l2₹2.0 L+₹4,234 (2.15%)Rejected-AOC 0 MAHARISHI DAYANAND NAGAR 1 KANHELI ROHTAK 124001 | ROHTAK | ROHTAK | HARYANA | 124001 | l2 | Rejected-AOC L2 |
Tender Value
₹2.0 L
EMD Value
₹3,940
Closing Date
5 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jagmal
DIV 1 Rohtak
A/mtc of SWD Scheme in CUE,...
2026_HBC_557682_1
2026A31CB643 0A4E 4FE8 A5DB 5E6CDA854BE7267HSV
Open Tender
Civil Works
Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹3,940
Yes
25 Nov 2026
30 Oct 2026
6 Nov 2026
30 Oct 2026
5 Nov 2026
30 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.52]Cement rendering on plaster 1 mm thick | 242 | Sqm | 28 | ₹6,776 |
| 2 | [11.7.1]20 mm cement plaster of mix : 1. 1:4 (1 cement: 4 fine sand) | 242 | Sqm | 176 | ₹42,592 |
| 3 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4 | cum | 4,374 | ₹17,496 |
| 4 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 400 | Kg. | 68 | ₹27,200 |
| 5 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 24 | cum | 4,287 | ₹1,02,888 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_637673.xls
BOQ • 0.34 MB
AD0184178.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .